United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA — page 119
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Goat Mountain BESS 2 Wind + storage · Goat Wind LLC |
101 MW | In study |
| Brahman Renewables Solar Solar + storage · Brahman Renewables |
101 MW | In study |
| Ringtail Ridge Storage Battery storage · KCE TX 26, LLC |
101 MW | In study |
| Echols Creek Storage Other · BT Ferguson Solar, LLC |
101 MW | Paused / redesign |
| Solar project 55, Douglas County Solar |
101 MW | Paused / redesign |
| Solar project 56, Douglas County Solar |
101 MW | Paused / redesign |
| Lemma Solar Solar · Greening USA Corp. |
101 MW | In study |
| San Bernard Storage Other · San Bernard Storage, LLC |
101 MW | Paused / redesign |
| Long Point Storage Solar + storage · Long Point Storage, LLC |
101 MW | Agreement signed |
| Mobee Springs BESS Battery storage · Mobee Springs, LLC |
101 MW | In study |
| Musgravite Solar Solar · BT Thompson Solar, LLC |
101 MW | In study |
| BRP Diran BESS Battery storage · BRP Diran BESS LLC |
101 MW | Agreement signed |
| Sugarloaf BESS Battery storage · Sugarloaf Clean Energy LLC |
101 MW | In study |
| Sagewood BESS Battery storage · Sagewood BESS, LLC |
101 MW | In study |
| Felix Storage Solar + storage · Felix 1, LLC |
101 MW | In study |
| Timber Cove Solar SLF Solar + storage · Freestone Solar, LLC |
101 MW | In study |
| Bradford Solar Solar |
101 MW | Agreement signed |
| Triangle Ranch Echo Onshore wind |
101 MW | Paused / redesign |
| Triangle Ranch Fox Onshore wind |
101 MW | Paused / redesign |
| Mud Cat Solar SLF Solar + storage · Mud Cat Solar, LLC |
101 MW | In study |
| Timberline Storage Solar + storage · Timberline Renewables, LLC |
101 MW | In study |
| BRP Musca BESS Battery storage · BRP Musca BESS LLC |
101 MW | In study |
| AP Greenport Battery storage · AP Greenport |
101 MW | In study |
| Wizard Ranch Solar Solar |
101 MW | Paused / redesign |
| Guinness BESS Battery storage · Momentum Energy Storage Partners,LLC |
101 MW | In study |
| Firefly Fields Solar Solar + storage · Firefly Fields Energy Center LLC |
101 MW | In study |
| Hermes Solar Solar + storage · Bell 1 Solar, LLC |
100 MW | Agreement signed |
| Lazy Frog Solar SLF Solar + storage · Lazy Frog Solar, LLC |
100 MW | In study |
| Goldfinch Storage Solar + storage · BT DJ4M Solar, LLC |
100 MW | In study |
| Hermes Storage Solar + storage · Bell 1 Storage LLC |
100 MW | Agreement signed |
| Main Horn Solar Solar · Main Horn Solar LLC |
100 MW | In study |
| Cobra Clean Energy Center Battery storage · Cobra Clean Energy Center LLC |
100 MW | In study |
| Firebird Solar Solar |
100 MW | Paused / redesign |
| Jim Wells BESS Battery storage · Jim Wells ESS |
100 MW | In study |
| Surplus; J199/J202 Other |
100 MW | In study |
| Pledgor BESS Battery storage · Pledgor BESS |
100 MW | In study |
| Ariji BESS Battery storage · Ariji BESS, LLC |
100 MW | Agreement signed |
| Rogers Creek BESS Battery storage · Dialville BESS |
100 MW | In study |
| DAMAZO (Second Division) SOLAR Solar · TX Gulf Solar 1 LLC |
100 MW | Agreement signed |
| Diamond Sage BESS 2 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Diamond Sage BESS 1 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Coleto Creek ESS Addition Battery storage |
100 MW | Paused / redesign |
| Solar + storage project J2773, Poinsett County Solar + storage |
100 MW | In study |
| Solar project GEN-2016-030, Johnston County Solar |
100 MW | Agreement signed |
| Battery storage project AH2-246, Prince George County Battery storage |
100 MW | In study |
| Ardesia Storage Battery storage · Ardesia Storage Project LLC |
100 MW | In study |
| Battery storage project J3159, Dubuque County Battery storage |
100 MW | In study |
| Solar project LGE-CS2025-013, Ballard County Solar |
100 MW | In study |
| Solar project J1234, Knox County Solar |
100 MW | Agreement signed |
| Battery storage project GEN-2024-333, Oklahoma County Battery storage |
100 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)