OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in the USA — page 119

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9,1872,001.0 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9,187 requests · page 119 of 184
ProjectCapacityStatusLocationRegionQueuedOnline
Goat Mountain BESS 2
Wind + storage · Goat Wind LLC
101 MWIn study Sterling, TXERCOT Jan 2025target 2027
Brahman Renewables Solar
Solar + storage · Brahman Renewables
101 MWIn study Milam, TXERCOT Oct 2024target 2029
Ringtail Ridge Storage
Battery storage · KCE TX 26, LLC
101 MWIn study Kendall, TXERCOT Jan 2021target 2028
Echols Creek Storage
Other · BT Ferguson Solar, LLC
101 MWPaused / redesign Lamar, TXERCOT Apr 2023target 2027
Solar project 55, Douglas County
Solar
101 MWPaused / redesign Douglas, WAWest Jan 2018target 2030
Solar project 56, Douglas County
Solar
101 MWPaused / redesign Douglas, WAWest Jan 2018target 2030
Lemma Solar
Solar · Greening USA Corp.
101 MWIn study Knox, TXERCOT Apr 2023target 2028
San Bernard Storage
Other · San Bernard Storage, LLC
101 MWPaused / redesign Wharton, TXERCOT Nov 2019target 2022
Long Point Storage
Solar + storage · Long Point Storage, LLC
101 MWAgreement signed Brazoria, TXERCOT Nov 2019target 2026
Mobee Springs BESS
Battery storage · Mobee Springs, LLC
101 MWIn study Refugio, TXERCOT Jun 2025target 2028
Musgravite Solar
Solar · BT Thompson Solar, LLC
101 MWIn study Henderson, TXERCOT Mar 2024target 2027
BRP Diran BESS
Battery storage · BRP Diran BESS LLC
101 MWAgreement signed Wharton, TXERCOT Dec 2020target 2028
Sugarloaf BESS
Battery storage · Sugarloaf Clean Energy LLC
101 MWIn study Dimmit, TXERCOT Mar 2024target 2028
Sagewood BESS
Battery storage · Sagewood BESS, LLC
101 MWIn study Glasscock, TXERCOT Sep 2022target 2028
Felix Storage
Solar + storage · Felix 1, LLC
101 MWIn study Wilbarger, TXERCOT Jan 2023target 2027
Timber Cove Solar SLF
Solar + storage · Freestone Solar, LLC
101 MWIn study Freestone, TXERCOT May 2023target 2027
Bradford Solar
Solar
101 MWAgreement signed Mckean, PAPJM Mar 2019target 2027
Triangle Ranch Echo
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Triangle Ranch Fox
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Mud Cat Solar SLF
Solar + storage · Mud Cat Solar, LLC
101 MWIn study Lamar, TXERCOT Oct 2023target 2027
Timberline Storage
Solar + storage · Timberline Renewables, LLC
101 MWIn study Nacogdoches, TXERCOT Aug 2023target 2029
BRP Musca BESS
Battery storage · BRP Musca BESS LLC
101 MWIn study Reagan, TXERCOT Jul 2020target 2027
AP Greenport
Battery storage · AP Greenport
101 MWIn study Travis, TXERCOT Jun 2022target 2027
Wizard Ranch Solar
Solar
101 MWPaused / redesign Jack, TXERCOT May 2023
Guinness BESS
Battery storage · Momentum Energy Storage Partners,LLC
101 MWIn study Williamson, TXERCOT Jul 2022target 2027
Firefly Fields Solar
Solar + storage · Firefly Fields Energy Center LLC
101 MWIn study Colorado, TXERCOT Jan 2025target 2028
Hermes Solar
Solar + storage · Bell 1 Solar, LLC
100 MWAgreement signed Bell, TXERCOT Sep 2021target 2026
Lazy Frog Solar SLF
Solar + storage · Lazy Frog Solar, LLC
100 MWIn study Franklin, TXERCOT Sep 2023target 2028
Goldfinch Storage
Solar + storage · BT DJ4M Solar, LLC
100 MWIn study Van Zandt, TXERCOT Oct 2023target 2028
Hermes Storage
Solar + storage · Bell 1 Storage LLC
100 MWAgreement signed Bell, TXERCOT Jul 2022target 2026
Main Horn Solar
Solar · Main Horn Solar LLC
100 MWIn study Navarro, TXERCOT target 2028
Cobra Clean Energy Center
Battery storage · Cobra Clean Energy Center LLC
100 MWIn study Brazoria, TXERCOT Feb 2024target 2027
Firebird Solar
Solar
100 MWPaused / redesign Ector, TXERCOT Nov 2023target 2026
Jim Wells BESS
Battery storage · Jim Wells ESS
100 MWIn study Jim Wells, TXERCOT Feb 2024target 2028
Surplus; J199/J202
Other
100 MWIn study Tuscola, MIMISO Jul 2024target 2013
Pledgor BESS
Battery storage · Pledgor BESS
100 MWIn study Matagorda, TXERCOT May 2023target 2028
Ariji BESS
Battery storage · Ariji BESS, LLC
100 MWAgreement signed Howard, TXERCOT Sep 2022target 2027
Rogers Creek BESS
Battery storage · Dialville BESS
100 MWIn study Cherokee, TXERCOT May 2023target 2028
DAMAZO (Second Division) SOLAR
Solar · TX Gulf Solar 1 LLC
100 MWAgreement signed Brazoria, TXERCOT Mar 2019target 2025
Diamond Sage BESS 2
Solar + storage · DGC Renewables, LLC
100 MWIn study Webb, TXERCOT Jan 2025target 2028
Diamond Sage BESS 1
Solar + storage · DGC Renewables, LLC
100 MWIn study Webb, TXERCOT Jan 2025target 2028
Coleto Creek ESS Addition
Battery storage
100 MWPaused / redesign Goliad, TXERCOT Dec 2019
Solar + storage project J2773, Poinsett County
Solar + storage
100 MWIn study Poinsett, ARMISO Sep 2022target 2027
Solar project GEN-2016-030, Johnston County
Solar
100 MWAgreement signed Johnston, OKSPP Mar 2016target 2026
Battery storage project AH2-246, Prince George County
Battery storage
100 MWIn study Prince George, VAPJM Mar 2022target 2025
Ardesia Storage
Battery storage · Ardesia Storage Project LLC
100 MWIn study Caldwell, TXERCOT Jun 2022target 2027
Battery storage project J3159, Dubuque County
Battery storage
100 MWIn study Dubuque, IAMISO Sep 2022target 2027
Solar project LGE-CS2025-013, Ballard County
Solar
100 MWIn study Ballard, KYSoutheast Dec 2025target 2028
Solar project J1234, Knox County
Solar
100 MWAgreement signed Knox, INMISO Apr 2019target 2023
Battery storage project GEN-2024-333, Oklahoma County
Battery storage
100 MWIn study Oklahoma, OKSPP Mar 2025target 2027
Page 119 of 184

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)