🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in ERCOT (Texas)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,986447.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,986 requests · page 1 of 40
ProjectCapacityStatusLocationRegionQueuedOnline
Prairie Ridge (Gas - CC)
Gas · Tenaska Power Generation, LLC
1,660 MWIn study Franklin, TXERCOT Dec 2025target 2032
Hecate Energy Orem Wind
Onshore wind · Hecate Energy LLC
1,542 MWIn study Brazoria, TXERCOT Jun 2023target 2030
Aegle Power
Gas · Aegle Power LLC
1,536 MWIn study Cameron, TXERCOT Jul 2024target 2027
Caldwell County Energy Center
Gas · Caldwell County Energy Center, LLC
1,500 MWIn study Caldwell, TXERCOT Feb 2025target 2030
Big Canyon Wind
Onshore wind · Longfellow Wind, LLC
1,500 MWIn study Pecos, TXERCOT Jan 2025target 2031
Mule Deer Run Gas
Gas · BOULEVARD ASSOCIATES, LLC
1,381 MWIn study Anderson, TXERCOT Nov 2025target 2032
BasRanch (TEF - Due Diligence)
Gas · CPV Basin Ranch, LLC
1,350 MWAgreement signed Ward, TXERCOT Aug 2020target 2028
Sandow Lakes Energy Station
Gas · SL Energy Power Plant I, LLC
1,292 MWIn study Milam, TXERCOT Mar 2024target 2028
Jewett Energy Center 1 Gas
Gas · Jewett Energy Center LLC
1,274 MWIn study Freestone, TXERCOT Oct 2025target 2029
Tolar Energy Center
Gas · NRG Tolar Power LLC
1,252 MWIn study Hood, TXERCOT Sep 2025target 2029
Limitless Energy Hub I
Gas · Limitless Energy Hub I LLC
1,238 MWIn study Wilbarger, TXERCOT Nov 2025target 2028
Limitless Energy Hub II
Gas · Limitless Energy Hub II LLC
1,238 MWIn study Wilbarger, TXERCOT Nov 2025target 2028
Southeast Oklahoma Pumped Storage
Other · Apex Energy Solutions, LLC
1,232 MWIn study Lamar, TXERCOT Aug 2022target 2030
Wolf Bone North Energy Center
Gas · NRG Wolf Bone Energy Center LLC
1,204 MWIn study Reeves, TXERCOT Oct 2025target 2029
Spectra Solar
Solar · SE DC Devco
1,200 MWIn study Scurry, TXERCOT Dec 2025target 2028
Corvette Wind
Onshore wind
1,200 MWPaused / redesign Carson, TXERCOT Feb 2024
Eagle Pines Gas
Gas · FGE Power
1,174 MWIn study Cherokee, TXERCOT Mar 2015target 2028
Aurelius Solar
Solar · IP Roman, LLC
1,124 MWAgreement signed Deaf Smith, TXERCOT Jul 2023target 2028
Bastrop Peaking Generators (TEF-Due Diligence)
Gas · MPH Bastrop Peakers, LLC
1,104 MWAgreement signed Bastrop, TXERCOT Feb 2024target 2027
Zeus Armstrong BESS
Solar + storage · Armstrong BESS, LLC
1,043 MWIn study Armstrong, TXERCOT Mar 2024target 2028
Zeus Scurry BESS
Solar + storage · Zeus Scurry BESS
1,043 MWIn study Scurry, TXERCOT Jun 2025target 2028
Zeus Mitchell BESS II
Solar + storage · Zeus Mitchell BESS II, LLC
1,043 MWIn study Mitchell, TXERCOT Jun 2025target 2027
Zeus Mitchell BESS
Solar + storage · Mitchell BESS
1,043 MWIn study Mitchell, TXERCOT May 2024target 2029
EmberGreen
Gas · EmberGreen Energy Center
1,036 MWIn study Wharton, TXERCOT Jun 2024target 2028
Hecate Energy Arkansas Wind
Onshore wind · Hecate Energy Gulf Wind LLC
1,029 MWIn study San Patricio, TXERCOT Jun 2023target 2030
Hecate Energy Jamaica Wind
Onshore wind · Hecate Energy LLC
1,029 MWIn study Galveston, TXERCOT Jun 2023target 2030
Kickstart Energy Storage VI
Battery storage · Kickstart Infrastructure LLC
1,026 MWIn study Ellis, TXERCOT Dec 2025target 2029
Ross Solar
Solar + storage · S&S Renewables, LLC
1,026 MWAgreement signed Refugio, TXERCOT Jul 2023target 2027
Pumpville Ranch 1
Solar
1,000 MWPaused / redesign Val Verde, TXERCOT
Kickstart Energy Storage V
Battery storage · Kickstart Infrastructure LLC
999 MWIn study Ellis, TXERCOT Nov 2025target 2029
Black Mountain Hale Gas
Gas · Fort Worth Power Core LLC
991 MWIn study Hale, TXERCOT Aug 2025target 2029
Zeus Spade Wind
Wind + storage · Spade Wind, LLC
987 MWIn study Mitchell, TXERCOT Mar 2024target 2027
Complex Serenity Wind
Onshore wind · Serenity Wind, LLC
971 MWIn study Armstrong, TXERCOT Jun 2025target 2029
Kilby1 Part 4 Large Block Simple Cycle
Gas · Energy Forge One LLC
950 MWIn study Reeves, TXERCOT Nov 2025target 2028
Riviera Gas
Gas · BKV-BPP Power
942 MWIn study Bell, TXERCOT Nov 2025target 2030
EmberYork
Gas · EmberYork Energy Center
900 MWAgreement signed Austin, TXERCOT Aug 2024target 2028
Fierce River Solar
Solar + storage · Rio Grande Solar LLC
896 MWIn study Starr, TXERCOT Mar 2024target 2029
West Royal Natural Gas (TEF-Due Diligence)
Gas · Invenergy Energy Transition Development LLC
888 MWIn study Upton, TXERCOT Jun 2024target 2030
Sim Gideon Combined Cycle
Gas · LCRA
880 MWIn study Bastrop, TXERCOT Jun 2025target 2030
Lost Pines Power Park
Gas · LCRA
880 MWIn study Bastrop, TXERCOT Jun 2025target 2030
Schneider Combined Cycle
Gas · LCRA
880 MWIn study Caldwell, TXERCOT Jul 2025target 2030
MilamStation Power Secured Gas Generation
Gas · Power Secured Holdings LLC
846 MWIn study Milam, TXERCOT Mar 2025target 2029
Shadow Ranch Solar
Solar · LectricWind LLC
808 MWIn study Upton, TXERCOT Sep 2022target 2026
Zeus Mitchell Solar
Solar + storage · Mitchell Solar, LLC
805 MWIn study Mitchell, TXERCOT Mar 2024target 2029
Indigo Solar 3
Solar · Indigo solar 3
800 MWIn study Fisher, TXERCOT Oct 2024target 2028
Blue Bird Solar
Solar · Gigawatt Solar LLC
773 MWAgreement signed Johnson, TXERCOT Nov 2021target 2028
Axis Ridge Wind
Onshore wind · Axis Ridge Wind, LLC
750 MWIn study Sutton, TXERCOT Nov 2024target 2029
Nabla Energy Storage I
Battery storage · Nabla Park LLC
750 MWIn study Tarrant, TXERCOT Nov 2025target 2028
Central Power Station
Gas · Hydra-Gen Energy Unlimited
750 MWIn study Grimes, TXERCOT Mar 2024target 2027
Nabla Energy Storage II
Battery storage · Nabla Park LLC
750 MWIn study Parker, TXERCOT Nov 2025target 2028
Page 1 of 40

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)