United States โ€บ Grid โ€บ Interconnection queues

OCTARY USA ยท INTERCONNECTION QUEUES

Interconnection queue in PJM (Mid-Atlantic, Midwest)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,248140.4 GW
Active in queue140.4 GW1,248 requests
Agreement signed35.0 GW343 requests
Withdrawn5,226638.1 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,248 requests ยท page 1 of 25
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore wind project AI2-431, Atlantic County
Offshore wind
2,139 MWIn study Atlantic, NJPJM Mar 2023target 2030
Gas project AG2-582, Doddridge County
Gas ยท CPV Shay, LLC
2,100 MWIn study Doddridge, WVPJM Feb 2025target 2026
Offshore wind project AI1-001, Monmouth County
Offshore wind
2,100 MWIn study Monmouth, NJPJM Apr 2022target 2029
Offshore wind project AJ1-015, Monmouth County
Offshore wind
1,342 MWIn study Monmouth, NJPJM Jun 2023target 2030
Offshore wind project AI1-109, Middlesex County
Offshore wind
1,310 MWIn study Middlesex, NJPJM Sep 2022target 2029
Offshore wind project AI1-111, Middlesex County
Offshore wind
1,310 MWIn study Middlesex, NJPJM Sep 2022target 2029
Offshore wind project AI1-110, Monmouth County
Offshore wind
1,310 MWIn study Monmouth, NJPJM Sep 2022target 2029
Gas project AH1-680, Carroll County
Gas ยท Chestnut Run Energy LLC
1,300 MWIn study Carroll, OHPJM Apr 2025
Maidsville CCGT
Gas
1,270 MWPaused / redesign Preston, WVPJM Sep 2018target 2026
Battery storage project AI2-457, Charles County
Battery storage
1,122 MWIn study Charles, MDPJM Mar 2023target 2027
Solar project AH2-351
Solar
1,000 MWIn study KYPJM Mar 2022target 2027
Solar project AH2-353
Solar
1,000 MWIn study KYPJM Mar 2022target 2028
Trumbull Energy Center
Gas
940 MWAgreement signed Trumbull, OHPJM Oct 2015target 2026
Nuclear project AH1-695, Dauphin County
Nuclear ยท Constellation Energy Generation, LLC
859 MWIn study Dauphin, PAPJM Apr 2025
Heritage Prairie Wind
Onshore wind
850 MWAgreement signed Kankakee, ILPJM Sep 2017target 2028
Cvow 2, Oss 2 โ€šร„รฌ T2G07
Offshore wind ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
836 MWIn study City Of Chesapeake, VAPJM Sep 2019target 2032
Cvow 1, Oss 1 - T1L11
Offshore wind ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
833 MWIn study City Of Chesapeake, VAPJM Sep 2019target 2032
Cvow 3, Oss 3 โ€šร„รฌ T3G15
Offshore wind ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
820 MWIn study City Of Chesapeake, VAPJM Sep 2019target 2032
Ocean Wind
Offshore wind
816 MWPaused / redesign Ocean, NJPJM May 2018target 2026
Solar + storage project AJ1-008, Clermont County
Solar + storage
800 MWIn study Clermont, OHPJM May 2023target 2028
Blackwater Solar
Solar
800 MWAgreement signed Sussex, VAPJM Sep 2018target 2029
Gas project AH1-721
Gas ยท East Kentucky Power Cooperative, Inc.
786 MWIn study KYPJM Apr 2025
Gas project AH1-712, Fluvanna County
Gas ยท Tenaska Power Generation, LLC
776 MWIn study Fluvanna, VAPJM Apr 2025
Gas project AH1-723, Fluvanna County
Gas ยท Tenaska Power Generation, LLC
776 MWIn study Fluvanna, VAPJM Apr 2025
Gas project AG2-072, Spencer County
Gas ยท Bluegrass Power LLC
700 MWIn study Spencer, INPJM Feb 2025target 2026
Solar project AH2-348, Daviess County
Solar
700 MWIn study Daviess, INPJM Mar 2022target 2025
Solar + storage project AH1-552, Prince George's County
Solar + storage ยท Chalk Point Steam, LLC
670 MWIn study Prince George's, MDPJM Mar 2025target 2025
Battery storage project AH1-716, James City County
Battery storage ยท Cardinal Energy Storage East, LLC
650 MWIn study James City, VAPJM Apr 2025
Sullivan Generating Station 1
Gas
575 MWAgreement signed Sullivan, INPJM Oct 2015target 2027
Sullivan Generating Station 2
Gas
575 MWAgreement signed Sullivan, INPJM Oct 2015target 2027
Chesterfield CT Units 3&4
Gas
569 MWAgreement signed Chesterfield, VAPJM Sep 2019target 2029
Chesterfield CT Units 1 and 2
Gas ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
569 MWIn study Chesterfield, VAPJM Sep 2019target 2029
Glen Falls Facility
Gas
550 MWAgreement signed Harrison, WVPJM Apr 2015target 2029
Battery storage project AH1-725, Harford County
Battery storage ยท Cardinal Energy Storage East, LLC
500 MWIn study Harford, MDPJM Apr 2025
Fourth Quarter
Battery storage ยท Fourth Quarter BESS, LLC
500 MWAgreement signed Montgomery, MDPJM Oct 2020target 2030
Randolph Solar
Solar ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
500 MWAgreement signed Halifax, VAPJM Dec 2019target 2032
Battery storage project AH2-416, Livingston County
Battery storage
450 MWIn study Livingston, ILPJM Mar 2022target 2026
Dolphin Solar
Solar ยท Dolphin Solar LLC
450 MWIn study Fountain, INPJM Sep 2020target 2024
Battery storage project AI1-022, Huntington County
Battery storage
450 MWIn study Huntington, INPJM Apr 2022target 2026
Ocean Wind LLC
Offshore wind
432 MWPaused / redesign Cape May, NJPJM Sep 2018target 2026
Battery storage project AH1-727, Loudoun County
Battery storage ยท Cardinal Energy Storage East, LLC
425 MWIn study Loudoun, VAPJM Apr 2025
Battery storage project AH2-333, Salem County
Battery storage
415 MWIn study Salem, NJPJM Mar 2022target 2025
Gas project AH1-711, Wood County
Gas ยท Troy Energy, LLC
408 MWIn study Wood, OHPJM Apr 2025
West Lorain Power Plant 345 kV
Gas
406 MWAgreement signed Lorain, OHPJM Sep 2020target 2031
Oak Run Solar Project
Solar
400 MWAgreement signed Madison, OHPJM Aug 2020target 2030
Oak Run Solar Project
Solar
400 MWAgreement signed Madison, OHPJM Aug 2020target 2030
Solar project AH2-352
Solar
400 MWIn study INPJM Mar 2022target 2026
Solar project AH2-257, Vermillion County
Solar
400 MWIn study Vermillion, INPJM Mar 2022target 2024
Battery storage project AG2-545, Mchenry County
Battery storage ยท Monarch Grid, LLC
400 MWIn study Mchenry, ILPJM Mar 2025target 2024
Solar project AG2-570, Brunswick County
Solar ยท Zeus Energy, LLC
400 MWIn study Brunswick, VAPJM Mar 2025target 2024
Page 1 of 25

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)