United States › Grid › Interconnection queues › Virginia

OFFSHORE WIND · PJM

Cvow 2, Oss 2 – T2G07

Cvow 2, Oss 2 – T2G07 is a 836 MW offshore wind request in interconnection study in the PJM interconnection queue, in City Of Chesapeake County, Virginia, connecting to Dominion.

Queue statusIn planning
  1. PlanningQueued Sep 2019 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2032 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AF1-124
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Connection point (POI)
Harper 230 kV
Location
City Of Chesapeake County, Virginia
Technology
Offshore Wind: 836 MW
Total requested
836 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Interim Study
Queue status
Active
Entered queue
17 September 2019
Proposed online date
December 2032

Location

Marker shows the centre of City Of Chesapeake County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in City Of Chesapeake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem