GENERATION · NETWORKS · ELECTRICITY DEMAND

Cables & grid projects.
Follow the energy.

Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.

29Matching project records
10Operating records
9Construction or enabling works
July 2026Official renewable register edition
Cables transfer electricity; their MW ratings are not generating capacity. EGL2 connects Peterhead to Drax. EGL1, EGL3, EGL4 and EGL5 have different endpoints and delivery stages.
Reset filters

29 results

Understand capacity and annual energy →
Grid upgrades

Beauly–Peterhead 400 kV Overhead Line

In planning
Not published

AC network reinforcement

Highlands / Moray / Aberdeenshire · Scotland

SSEN Transmission

SSEN submitted its overhead-line consent application in October 2025. The proposal strengthens the inland transmission route to Peterhead. A submitted application is distinct from consent or main construction.

Source review: 2026-10-08
Interconnectors

BritNed

Operating
1,000 MW

Transfer capacity

Isle of Grain ↔ Maasvlakte, Netherlands · United Kingdom

National Grid Ventures / partner operator

BritNed is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.

Source review: 2026-10-08
Transmission links

Caithness–Moray HVDC Link

Operating
1,200 MW

Transfer capacity

Caithness / Moray · Scotland

SSEN Transmission

The completed HVDC link transfers northern Scottish renewable electricity through the Moray Firth. Its 1.2 GW rating is the link’s transfer capability, rather than energy generated by the cable. It is part of the network into which the Shetland connection integrates.

Source review: 2026-10-08
Interconnectors

Celtic Interconnector (Ireland–France)

Under construction
700 MW

Transfer capacity

Ireland / France · Ireland

EirGrid / RTE

Irish onshore cable installation and testing were reported complete in May 2026. Celtic connects Ireland directly to France. It is included as a neighbouring-market project relevant to all-island electricity trading; it is not a Great Britain grid connection.

Source review: 2026-10-08
Transmission links

Eastern Green Link 1 (Torness–Hawthorn Pit)

Under construction
2,000 MW

Transfer capacity

East Lothian / County Durham · United Kingdom

SP Energy Networks / National Grid

Onshore construction was announced in February 2025. EGL1 connects the Torness area to Hawthorn Pit over a predominantly subsea route of more than 190 km. It is distinct from EGL2 and does not terminate at Drax.

Source review: 2026-10-08
Transmission links

Eastern Green Link 2 (Peterhead–Drax)

Under construction
2,000 MW

Transfer capacity

Aberdeenshire / North Yorkshire · United Kingdom

SSEN Transmission / National Grid

EGL2 links Peterhead and Drax through a 505 km HVDC route. Construction is underway following the 2024 approvals. Its converters connect the subsea DC system to the AC transmission networks at each end. It transfers electricity between regions; its rating is not additional generating capacity.

Source review: 2026-10-08
Transmission links

Eastern Green Link 3 (Peterhead–West Norfolk)

In planning
2,000 MW

Transfer capacity

Aberdeenshire / Lincolnshire / Norfolk · United Kingdom

SSEN Transmission / National Grid

Major converter and cable contracts were announced in March 2026. Planning and consultation continue. EGL3 and EGL4 share proposed English landfall and cable corridors, with separate converter stations in the Walpole area. Contract awards are not evidence that the complete link is already under construction.

Source review: 2026-10-08
Transmission links

Eastern Green Link 4 (Fife–West Norfolk)

In planning
2,000 MW

Transfer capacity

Fife / Lincolnshire / Norfolk · United Kingdom

SP Energy Networks / National Grid

Supply-chain agreements were announced in March 2026. Main construction is expected in 2028 subject to consent, with completion scheduled for 2033. The proposed English converter is in West Norfolk; older descriptions of a Lincolnshire endpoint can confuse the cable landfall with the grid connection.

Source review: 2026-10-08
Transmission links

Eastern Green Link 5

In planning
Not published

Not yet confirmed

Scotland / Lincolnshire · United Kingdom

SSEN Transmission / National Grid

Second-stage consultation took place from May to July 2026. EGL5 is a further Scotland–England subsea connection proposal, separate from EGL3 and EGL4. The proposed Lincolnshire connection relates to the LCS-B substation within the Grimsby to Walpole scheme.

Source review: 2026-10-08
Interconnectors

Greenlink (Wales–Ireland)

Operating
500 MW

Transfer capacity

Pembrokeshire / Ireland · United Kingdom

Greenlink

Greenlink links the Irish and British electricity markets through subsea and underground cable. The developer’s FAQ records operation from February 2025. Its nominal 500 MW capacity is bidirectional transfer capability, not a constant flow.

Source review: 2026-10-08
Interconnectors

IFA

Operating
2,000 MW

Transfer capacity

Kent ↔ northern France · United Kingdom

National Grid Ventures / partner operator

IFA is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.

Source review: 2026-10-08
Interconnectors

IFA2

Operating
1,000 MW

Transfer capacity

Southern England ↔ Normandy, France · United Kingdom

National Grid Ventures / partner operator

IFA2 is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.

Source review: 2026-10-08
Grid upgrades

Kintore–Tealing 400 kV Connection

In planning
Not published

AC network reinforcement

Aberdeenshire / Angus · Scotland

SSEN Transmission

The overhead-line application was submitted in September 2025 and is in the consent process. Government case material records an inquiry. The proposed reinforcement should be distinguished from separate substation work packages and existing network assets.

Source review: 2026-10-08
Interconnectors

LionLink Offshore Hybrid Asset

In planning
2,000 MW

Maximum export connection

Suffolk / Netherlands · United Kingdom

National Grid Ventures / TenneT

LionLink combines a connection to Dutch offshore wind with electricity exchange between Britain and the Netherlands. Current connection documents distinguish up to 2 GW export from 1.8 GW import. It remains a proposed project, not an operational source of supply.

Source review: 2026-10-08
Interconnectors

Nautilus Interconnector

In planning
1,400 MW

Transfer capacity

Great Britain / Belgium · United Kingdom

National Grid Ventures

National Grid is refining plans for a new British–Belgian subsea electricity connection. The earlier Suffolk connection agreement was removed; that should not be reported as the cancellation of all Nautilus development. Current route and converter options require further confirmation.

Source review: 2026-10-08
Interconnectors

Nemo Link

Operating
1,000 MW

Transfer capacity

Kent ↔ Belgium · United Kingdom

National Grid Ventures / partner operator

Nemo Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.

Source review: 2026-10-08
Grid upgrades

Netherton Hub, Peterhead

Under construction
Not published

Multiple substations and converters

Aberdeenshire · Scotland

SSEN Transmission

Construction started in June 2026. Netherton combines 400 kV and 132 kV substations with HVDC infrastructure serving northern generation and proposed onward links. The individual cable ratings must not be added together as a single hub generating capacity.

Source review: 2026-10-08
Interconnectors

NeuConnect (Great Britain–Germany)

Under construction
1,400 MW

Transfer capacity

Kent / Germany · United Kingdom

NeuConnect

Converter fit-out was reported in September 2026. NeuConnect is the first direct electricity connection between Great Britain and Germany, with approximately 725 km of land and subsea cables. It supports imports or exports according to system conditions.

Source review: 2026-10-08
Interconnectors

North Sea Link

Operating
1,400 MW

Transfer capacity

Blyth, Northumberland ↔ Kvilldal, Norway · United Kingdom

National Grid Ventures / partner operator

North Sea Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.

Source review: 2026-10-08
Transmission links

Orkney–Caithness Transmission Link

Under construction
220 MW

Transfer capacity

Orkney / Caithness · Scotland

SSEN Transmission

Underground cable installation began in September 2026. The scheme includes Finstown substation, a 14 km land cable to Warebeth and a 53 km subsea cable to Dounreay. It creates Orkney’s first connection to the mainland transmission network.

Source review: 2026-10-08
Transmission links

Sea Link (Suffolk–Kent)

In planning
Not published

Transfer rating not verified

Suffolk / Kent · England

National Grid

A 138 km primarily offshore link is awaiting its development-consent decision, expected by 30 October 2026. Surveys and archaeological works have separate permissions. These preparatory activities do not establish consent for the main link, whose construction programme is conditional on approval.

Source review: 2026-10-08
Transmission links

Shetland HVDC Link

Operating
600 MW

Transfer capacity

Shetland / Caithness · Scotland

SSEN Transmission

The Shetland connection was energised in 2024. Its 260 km subsea link integrates with the Caithness–Moray system. It connects island renewable generation, including the Viking wind farm, while providing a connection for island electricity supply.

Source review: 2026-10-08
Grid upgrades

Spittal–Loch Buidhe–Beauly 400 kV Connection

In planning
Not published

AC network reinforcement

Caithness / Sutherland / Highlands · Scotland

SSEN Transmission

The proposed 400 kV route is undergoing the consent process. The government’s appeal and inquiry record identifies inquiry, hearing and written procedures in 2026. This is not reported here as a consented or operating line.

Source review: 2026-10-08
Transmission links

Spittal–Peterhead HVDC Link

Under construction
2,000 MW

Transfer capacity

Caithness / Aberdeenshire · Scotland

SSEN Transmission

Cable construction is underway. The approximately 203 km link includes a 166 km subsea section between Sinclair’s Bay and Rattray Head. It connects the Banniskirk and Netherton hubs and supports movement of northern Scottish generation toward demand centres.

Source review: 2026-10-08
Interconnectors

Viking Link

Operating
1,400 MW

Transfer capacity

Bicker Fen, Lincolnshire ↔ Revsing, Denmark · United Kingdom

National Grid Ventures / partner operator

Viking Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.

Source review: 2026-10-08
Transmission links

Western HVDC Link

Operating
2,200 MW

Published transfer capacity

Ayrshire / North Wales · United Kingdom

SP Energy Networks / National Grid

The operating Western Link connects Hunterston to Flintshire Bridge. Its route is approximately 420 km, including 385 km subsea. It carries electricity between Scotland and Wales and is a separate asset from the proposed Western Link 2.

Source review: 2026-10-08
Transmission links

Western Isles HVDC Link

Enabling works
1,800 MW

Transfer capacity

Lewis / Highlands · Scotland

SSEN Transmission

Mainland cable preparation and associated early works are underway in 2026. The link is designed to connect Lewis to the mainland and unlock island renewable generation. This 1.8 GW scheme supersedes the earlier 600 MW proposal. Work packages are at different stages.

Source review: 2026-10-08
Transmission links

Western Link 2

In planning
Not published

Rating requires confirmation

Ayrshire / Gwynedd · United Kingdom

SP Energy Networks / National Grid

Western Link 2 is a proposed predominantly subsea connection from Ayrshire to the Gwynedd coast. A new converter would connect to Pentir substation. Public consultation took place in 2026. The project is separate from the operating Western Link.

Source review: 2026-10-08
Grid upgrades

Yorkshire GREEN

Under construction
Not published

Network reinforcement

North Yorkshire · England

National Grid

Preparation began in autumn 2024 and main construction in early 2025. Yorkshire GREEN reinforces overhead lines and substations in North Yorkshire. It complements regional grid investment but is a separate project from the Peterhead–Drax cable.

Source review: 2026-10-08
GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.

The wider power system

Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.

Read the scope, licences and refresh schedule