Grid upgrades · Longside / Flushing / Peterhead, Aberdeenshire

Netherton Hub / Longside substations and HVDC converters

Under construction

Main hub construction is underway near Longside, west of Peterhead. The development comprises 400 kV and 132 kV substations, separate Spittal–Peterhead and EGL3 HVDC converter stations, a transmission hall identified for EGL5, and an operations and spares base. Shared site earthworks do not mean that every converter or cable is already operational.

Sources reviewed 2026-10-08 · SSEN Transmission

Project facts

StatusUnder construction
Developer / operatorSSEN Transmission
RegionLongside / Flushing / Peterhead, Aberdeenshire
CountryScotland
Published ratingNot published
Rating definitionMultiple substations and converters
Connection / routeNetherton near Longside ↔ Banniskirk via Rattray Head / Crimond; proposed EGL3 onward to Norfolk; proposed EGL5 to Lincolnshire
Delivery targetNot verified in this profile
Voltage400 kV

The hub is in its construction phase. SSEN says Phase 1 approvals cover civil works and platforms; detailed electrical equipment approvals follow in stages. September 2026 notices describe October access works off the A950.

What this link contributes

This asset provides a route for electricity to move between networks or strengthens the network carrying that electricity. Its capacity cannot be added to wind, solar or power-station capacity as though it were another generator.

Netherton near Longside ↔ Banniskirk via Rattray Head / Crimond; proposed EGL3 onward to Norfolk; proposed EGL5 to Lincolnshire

Converter stations, cable manufacture, offshore installation, landfall works and grid energisation can progress at different times. The status above describes the documented project stage rather than assuming all work packages are complete.

Project location

SSEN publishes grid reference NK052460 for this hub near Longside. The reference is a 100 m grid square, not a precise equipment position or entrance. The two converters, AC substations and transmission hall are components of this shared hub.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. June 2026 construction start
    Reviewed 2026-10-08
  2. Hub components
    Reviewed 2026-10-08
  3. Current hub components, phased approvals and construction notices
    Reviewed 2026-10-08
  4. Developer EIA: published location grid reference
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.