Project facts
| Status | Under construction |
|---|---|
| Developer / operator | SSEN Transmission |
| Region | Netherton / Longside / Peterhead, Aberdeenshire |
| Country | Scotland |
| Published rating | Not published |
| Rating definition | Component of a parent transmission project; no additional link capacity counted |
| Connection / route | Netherton Hub |
| Delivery target | Not verified in this profile |
| Voltage | 400 kV |
What this link contributes
This asset provides a route for electricity to move between networks or strengthens the network carrying that electricity. Its capacity cannot be added to wind, solar or power-station capacity as though it were another generator.
Netherton Hub
Converter stations, cable manufacture, offshore installation, landfall works and grid energisation can progress at different times. The status above describes the documented project stage rather than assuming all work packages are complete.
Project location
This is a component of its parent project. Dashed circles show an approximate area only; the exact component position is not verified.
Loading OpenStreetMapβ¦
- Netherton Hub area β individual building position not pinned Approximate area; exact site not confirmed Open larger map Location source Coordinate source 57.505, -1.914 Β· WGS84
Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2βs additional outlines and route layers are explicitly identified in the developerβs map data.
Sources and review date
- Developer project information
Reviewed 2026-10-08