Grid Capacity Map 🔴 NESO Data
Available generation connection capacity at UK Grid Supply Points · Data: NESO Data Portal & DNO Heat Maps · Updated live
—GSPs / SubstationsTransmission & primary
—Available> 50 MW headroom
—Constrained< 50 MW headroom
—At CapacityReinforcement needed
Grid Supply Points — Loading…
Available (>50 MW)
Constrained (<50 MW)
At Capacity
Circle size = installed capacity