OCTARY · GB GRID INFRASTRUCTURE

Britain’s electricity grid

The high-voltage transmission network across England, Scotland and Wales, the upgrades planned to 2035, and the projects queuing to connect to it.

Transmission circuits13,877 km551 circuits at 132–400 kV
Substations648226 at 400 kV
Connection queue683.3 GW1,855 projects waiting to connect
Network projects14318 under construction

Grid map

Existing transmission circuits by voltage, new circuits planned to 2035 (dashed), network upgrade projects and the connection queue. Turn layers on and off, and click anything for details.

Loading map…

Circuits400 kV275 kV132 kVHVDCNew HVACProjectsPlanningConsentedConstructionBuilt

Connection queue by stage

Every project holding a transmission connection agreement with NESO, from early scoping to built.

Network upgrade projects

New circuits, substations and upgrades in NESO’s plan for a clean power system by 2030, and the follow-on work to 2035.

ProjectStageRegionIn service
Install new MSCs at Burwell Main
New network upgrade · HND essential option
ConstructionEast Midlands2022
Carry out thermal upgrading on the existing circuit between Keadby and West Burton
Existing network upgrade · HND essential option
ConstructionEast Midlands, Yorkshire and Humber2024
Reactive compensation protective switching scheme
New network upgrade · Proceed
ConstructionSouth West England2024
Install further voltage support equipment at Pelham
Existing network upgrade · Proceed
ConstructionEast of England2024
Install voltage support equipment at Pelham
Existing network upgrade · Proceed
ConstructionEast of England2024
Power control device along Blyth to Tynemouth and Blyth to South Shields
New network upgrade · Proceed
ConstructionNorth East England2024
Reactive compensation protective switching scheme
New network upgrade · Proceed
ConstructionSouth West England2024
Reactive compensation protective switching scheme
New network upgrade · Proceed
ConstructionSouth West England2024
Replace the conductors on the existing circuit between Cottam and Keadby with higher capacity conductors
Existing network upgrade · HND essential option
ConstructionEast Midlands, Yorkshire and Humber2025
Thermal upgrade for Sundon and Wymondley 400 kV substation
Existing network upgrade · HND essential option
ConstructionEast Midlands2025
Add power control devices to the existing circuits between Blyth and Tynemouth and Blyth and South Shields
Existing network upgrade · Proceed
ConstructionNorth East England2025
Carry out thermal upgrading on the existing circuit between Bramley and Melksham
Existing network upgrade · Hold
ConstructionSouth East England, South West England2026
Denny North 400/275 kV second supergrid transformer
New network upgrade · Hold
ConstructionNorth of Scotland2026
A new 400 kV double circuit between the existing Norton to Osbaldwick circuit and Poppleton and relevant 275 kV upgrades
New onshore circuit · HND essential option
ConstructionYorkshire and Humber2027
Replace the conductors on the existing circuit between Bramley and Melksham with higher capacity conductors
Existing network upgrade · Hold
ConstructionSouth East England, South West England2027
Upgrade the existing network to a higher voltage at Bridgewater and replace the conductors on the existing circuit to Hinkley with higher capacity conductors
Existing network upgrade · Hold
ConstructionSouth West England2027
New offshore HVDC link between Torness and Hawthorn Pit (Eastern Green Link 1)
New offshore circuit · HND essential option
ConstructionCentral and Southern Scotland, North East England2027
Replace the conductors on the existing circuit between Drax and Fenwick Tee with higher capacity conductors
Existing network upgrade · HND essential option
ConstructionYorkshire and Humber2030
New offshore HVDC link between Peterhead and Drax (Eastern Green Link 2)
New offshore circuit · HND essential option
Planning/consentingNorth of Scotland, Yorkshire and Humber2029
New circuit between New Deer and Greens (New Deer 2)
New onshore circuit · Enabling works
Planning/consentingNorth of Scotland2030
New circuit between Banniskirk (Spittal) and Carnaig (Loch Buidhe)
New onshore circuit · HND essential option
Planning/consentingNorth of Scotland2030
New circuit from Kintore to Emmock (Tealing) and upgrade elements of the existing Emmock to Westfield and Alyth to Emmock circuits
New onshore circuit · HND essential option
Planning/consentingCentral and Southern Scotland2030
New offshore HVDC link between East Scotland and the East of England (Eastern Green Link 4)
New offshore circuit · HND essential option
Planning/consentingCentral and Southern Scotland, East of England2030
New offshore circuit between Banniskirk (Spittal) and Longside (Peterhead 2)
New offshore circuit · HND essential option
Planning/consentingNorth of Scotland2030
New circuit between Coachford (Blackhillock 2) and Peterhead
New onshore circuit · HND essential option
Planning/consentingNorth of Scotland2030

Interconnectors

Cables to other countries’ grids, from the NESO interconnector register.

InterconnectorExportStageConnects atFrom
Aquind Interconnector
Aquind Limited
2.1 GWAwaiting ConsentsLovedean 400kV Substation2030
IFA Interconnector
National Grid Interconnectors Limited
2.0 GWBuiltSellindge 400kV Substation
Alverdiscott
Xlinks 1 Ltd
1.8 GWScopingAlverdiscott 400kV Substation2030
Alverdiscott 2
Xlinks 1 Ltd
1.8 GWScopingAlverdiscott 400kV Substation2032
Continental Link
National Grid Interconnector Holdings Limited
1.8 GWScopingBirkhill Wood 400kV Substation2035
GB-EU MPI
Windgrid
1.8 GWScopingFiddes 400kV Substation2033
Teeside MPI
National Grid Interconnector Holdings Limited
1.8 GWScopingWearside Connection Node B 400kV Substation2035
The Superconnection
Asc Energy plc
1.8 GWScopingBirkhill Wood 400kV Substation2037
LionLink (EuroLink)
National Grid Interconnector Holdings Limited
1.6 GWScopingFriston 400kV Substation2032
Celtic MPI
National Grid Interconnector Holdings Limited
1.5 GWScopingAlverdiscott 400kV Substation2037
Gridlink Interconnector
Gridlink Interconnector Limited
1.5 GWScopingKingsnorth 400kV Substation2029
Nautilus
National Grid Interconnector Holdings Limited
1.5 GWScopingWallend 400kV Substation2029
Viking Link Denmark Interconnector
National Grid Viking Link Limited
1.5 GWBuiltBicker Fen 400kV Substation
Western MPI
National Grid Interconnector Holdings Limited
1.5 GWScopingConnah's Quay 400kV Substation2037
NS Link
National Grid North Sea Link Limited
1.5 GWBuiltBlyth GSP
NeuConnect Interconnector
Neuconnect Britain Ltd
1.5 GWUnder Construction/CommissioningWallend 400kV Substation2027
Cronos
Cronos Energy Ltd
1.4 GWScopingKemsley 400kV Substation2029
Low Carbon Link
Low Carbon Solar Park 39 Limited
1.4 GWScopingSouth Wales West Connection Node C 400Kv Substation2037
NorthConnect
Northconnect Limited
1.4 GWScopingPeterhead 400kV Substation2030
Tarchon
Tarchon Energy Limited
1.4 GWScopingEast Anglia Connection Node 400kV Substation2030
FAB Link Interconnector
FAB Link Limited
1.3 GWAwaiting ConsentsExeter 400kV Substation2032
Seneca
Frontier Power International Limited
1.3 GWScopingMablethorpe 400kV Substation2031
Britned
Britned Development Limited
1.2 GWBuiltGrain 400kV Substation
IFA2 Interconnector
National Grid Ifa 2 Limited
1.2 GWBuiltChilling 400kV Substation
ElecLink
Eleclink Limited
1.1 GWBuiltSellindge 400kV Substation
Project Cobalt
Getlink Projects 2 Limited
1.1 GWScopingEast Kent Connection Node B 400kV Substation2036
Nemo Link
Nemo Link Limited
1.0 GWBuiltRichborough 400kV Substation
The Superconnection
Asc Energy plc
1.0 GWScopingBirkhill Wood 400kV Substation2032
Mares
Maresconnect Limited
750 MWAwaiting ConsentsBodelwyddan 400kV Substation2030
Kulizumboo Interconnector
Kulizumboo Limited
700 MWScopingCanterbury 400kV GIS Substation2031
LIRIC Interconnector
TI LIRIC Limited
700 MWScopingHunterston East 400kV2032
East West Interconnector
Eirgrid Interconnector Designated Activity Company
585 MWBuiltDeeside 400kV Substation
Greenlink
Greenlink Interconnector Limited
524 MWBuiltPembroke 400kV Substation
Auchencrosh (interconnector CCT)
Moyle Interconnector Limited
500 MWBuiltAuchencrosh 275kV
Isle of Man Interconnector
Manx Utilities
74 MWBuiltBispham 132kV Substation

More on the grid

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.