Grid infrastructure › Connection queue › Interconnector
INTERCONNECTOR · NGETKulizumboo Interconnector
Kulizumboo Interconnector is a 700 MW interconnector project in planning, connecting to the National Grid (England & Wales) network at Canterbury 400kV GIS Substation, with capacity due from April 2031. The connection agreement is held by Kulizumboo Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001290
- Customer
- Kulizumboo Limited
- Technology
- Interconnector
- Export capacity
- 700 MW
- Import capacity
- 700 MW
- Change in this agreement
- +700 MW
- Capacity effective from
- 1 April 2031
- Connection site
- Canterbury 400kV GIS Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Interconnector
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO interconnector register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem