Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Bute Hydrogen Project 1 Gas · Haldane Energy Project 1 Limited |
4.8 GW | Scoping |
| Drax BECCS Demand (data centres, industry) · Drax Power Limited |
3.9 GW | Scoping |
| Drax Power Station Other · Drax Power Limited |
3.9 GW | |
| Bute Hydrogen Project 2 Gas · Haldane Energy Project 2 Limited |
3.6 GW | Scoping |
| Bute Hydrogen Project 3 Gas · Haldane Energy Project 3 Limited |
3.6 GW | Scoping |
| Bute Hydrogen Project 5 Gas · Haldane Energy Project 5 Limited |
3.6 GW | Scoping |
| Bute Hydrogen Project 6 Gas · Haldane Energy Project 6 Limited |
3.6 GW | Scoping |
| Hinkley Point C Nuclear · Nnb Generation Company (Hpc) Limited |
3.3 GW | Scoping |
| Sizewell C Nuclear · Sizewell C Limited |
3.3 GW | Consents Approved |
| Hornsea Power Station 3 Offshore wind · Hornsea Project Three (UK) Limited |
3.0 GW | Consents Approved |
| Marram Wind Offshore Wind Farm Offshore wind · Marramwind Limited |
3.0 GW | Scoping |
| Hornsea Power Station 4 Offshore wind · Orsted Hornsea Project Four Limited |
2.6 GW | Scoping |
| Portwind Offshore wind · Se Portwind Ltd |
2.5 GW | Scoping |
| Eggborough CCGT - OCGT - BESS Battery storage · Eggborough Power Limited |
2.5 GW | Awaiting Consents |
| Bute Hydrogen Project 4 Gas · Haldane Energy Project 4 Limited |
2.4 GW | Scoping |
| Bute Hydrogen Project 7.1 Battery storage · Haldane Energy Project 7 Limited |
2.4 GW | Scoping |
| Heysham Power Station Nuclear · EDF Energy Nuclear Generation Limited |
2.4 GW | |
| Hornsea Power Station 3 Offshore wind · Hornsea Project Three (UK) Limited |
2.3 GW | Consents Approved |
| OWPL Windfarm Offshore wind · Offshore Wind Power Limited |
2.3 GW | Scoping |
| Pembroke Power Station Hydro and pumped storage · RWE Generation UK Plc |
2.2 GW | |
| Aquind Interconnector Interconnector · Aquind Limited |
2.1 GW | Awaiting Consents |
| Caledonia Offshore Wind Farm Offshore wind · Caledonia Offshore Wind Farm Limited |
2.0 GW | Scoping |
| Gallos Offshore wind · Corio Generation Limited |
2.0 GW | Scoping |
| Machair Offshore Wind Farm Offshore wind · Scottish Power Renewables (UK) Limited |
2.0 GW | Scoping |
| Walpole Flexible Generation Battery storage · Flexible Generation 1 Ltd |
2.0 GW | Scoping |
| Eggborough CCGT - OCGT - BESS Battery storage · Eggborough Power Limited |
2.0 GW | Awaiting Consents |
| IFA Interconnector Interconnector · National Grid Interconnectors Limited |
2.0 GW | |
| West Burton B Battery storage · West Burton B Limited |
1.9 GW | |
| West Burton B Battery storage · West Burton B Limited |
1.8 GW | |
| Arven Offshore Wind Farm Offshore wind · Arven Offshore Wind Farm Limited |
1.8 GW | Scoping |
| Bellrock Offshore Wind Farm Offshore wind · Bellrock Offshore Wind Farm Limited |
1.8 GW | Scoping |
| Berwick Bank Offshore Wind Farm C Offshore wind · Berwick Bank C Limited |
1.8 GW | Scoping |
| Carrington Lane BESS Battery storage · Apatura Battery Ltd |
1.8 GW | Scoping |
| Damhead Creek 2 Battery storage · VPI Power Limited |
1.8 GW | Consents Approved |
| Earba PSH Hydro and pumped storage · Earba Limited |
1.8 GW | Consents Approved |
| Glen Earrach PSH Hydro and pumped storage · Glen Earrach Energy Limited |
1.8 GW | Scoping |
| North-East Offshore Hybrid Asset Offshore wind · National Grid Interconnector Holdings Limited |
1.8 GW | Scoping |
| Alverdiscott Interconnector · Xlinks 1 Ltd |
1.8 GW | Scoping |
| Alverdiscott 2 Interconnector · Xlinks 1 Ltd |
1.8 GW | Scoping |
| Continental Link Interconnector · National Grid Interconnector Holdings Limited |
1.8 GW | Scoping |
| GB-EU MPI Interconnector · Windgrid |
1.8 GW | Scoping |
| Teeside MPI Interconnector · National Grid Interconnector Holdings Limited |
1.8 GW | Scoping |
| The Superconnection Interconnector · Asc Energy plc |
1.8 GW | Scoping |
| NatPower Enderby - Patford Bridge Green Energy Park Battery storage · Enderby Energy Limited |
1.8 GW | Scoping |
| Staythorpe C Gas · RWE Generation UK Plc |
1.8 GW | |
| Didcot B Battery storage · RWE Generation UK Plc |
1.7 GW | |
| Hinkley Point C Nuclear · Nnb Generation Company (Hpc) Limited |
1.7 GW | Scoping |
| Sizewell C Nuclear · Sizewell C Limited |
1.7 GW | Consents Approved |
| Dinorwig Hydro and pumped storage · First Hydro Company |
1.6 GW | |
| Springwell Solar + storage · Springwell Energyfarm Limited |
1.6 GW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.