Grid infrastructure › Connection queue › Offshore wind

OFFSHORE WIND · NGET

Berwick Bank Offshore Wind Farm C

Berwick Bank Offshore Wind Farm C is a 1.8 GW offshore wind project in planning, connecting to the National Grid (England & Wales) network at Blyth 400kV Substation, with capacity due from November 2029. The connection agreement is held by Berwick Bank C Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-000513
Customer
Berwick Bank C Limited
Technology
Wind Offshore
Total capacity
1.8 GW
Change in this agreement
+1.8 GW
Capacity effective from
30 November 2029
Connection site
Blyth 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Blyth · Grid map

Other projects at Blyth 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem