Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Walpole Flexible Generation

Walpole Flexible Generation is a 2.0 GW battery storage project in planning, connecting to the National Grid (England & Wales) network at Walpole 400kV Substation, with capacity due from June 2033. The connection agreement is held by Flexible Generation 1 Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002440
Customer
Flexible Generation 1 Ltd
Technology
CCGT (Combined Cycle Gas Turbine), Energy Storage System
Total capacity
2.0 GW
Change in this agreement
+2.0 GW
Capacity effective from
30 June 2033
Connection site
Walpole 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Walpole · Grid map

Other projects at Walpole 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem