Grid infrastructure βΊ Connection queue βΊ Other
OTHER Β· NGETWalpole Grid Services Facility
Walpole Grid Services Facility is a 0 MW other project consented, connecting to the National Grid (England & Wales) network at Walpole 400kV Substation, with capacity due from July 2026. The connection agreement is held by Conrad (Walpole) Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Jul 2026 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-003728
- Customer
- Conrad (Walpole) Limited
- Technology
- Reactive Compensation
- Total capacity
- 0 MW
- Capacity effective from
- 13 July 2026
- Connection site
- Walpole 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Walpole 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem