🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Gas

GAS · NGET

Bute Hydrogen Project 1

Bute Hydrogen Project 1 is a 4.8 GW gas project in planning, connecting to the National Grid (England & Wales) network at Trent Valley South Connection Node D 400kV Substation, with capacity due from October 2035. The connection agreement is held by Haldane Energy Project 1 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004124
Customer
Haldane Energy Project 1 Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
4.8 GW
Change in this agreement
+4.8 GW
Capacity effective from
30 October 2035
Connection site
Trent Valley South Connection Node D 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Trent Valley South Connection Node D · Grid map

Other projects at Trent Valley South Connection Node D 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem