BATTERY STORAGE · NGETEggborough CCGT - OCGT - BESS
Eggborough CCGT - OCGT - BESS is a 2.5 GW battery storage project in planning, connecting to the National Grid (England & Wales) network at Eggborough 400kV Substation, with capacity due from October 2027. The connection agreement is held by Eggborough Power Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000136-2
- Customer
- Eggborough Power Limited
- Technology
- CCGT (Combined Cycle Gas Turbine), Energy Storage System, OCGT (Open Cycle Gas Turbine)
- Total capacity
- 2.5 GW
- Change in this agreement
- +451 MW
- Capacity effective from
- 1 October 2027
- Connection site
- Eggborough 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Eggborough 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem