NESO TEC REGISTER · GREAT BRITAINWind + storage projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| ER TWD Energy Wind + storage · Er Project Development Co Limited |
700 MW | Scoping |
| Glenfiddich West Wind + storage · Boralex Limited |
600 MW | Scoping |
| Blacklaw Wind + storage · Scottish Power Renewables (UK) Limited |
340 MW | Scoping |
| Knarie Wind + storage · Invenergy Development UK Ltd |
297 MW | Awaiting Consents |
| Bodinglee Wind Farm Wind + storage · Bodinglee Wind Farm Limited |
280 MW | Awaiting Consents |
| Dunan Hill Wind + storage · Perigus Energy UK Limited |
250 MW | Scoping |
| Lightsource Bagots Farm Wind + storage · Lightsource Renewable UK Development Limited |
240 MW | Scoping |
| Lightsource Folly Farm Wind + storage · Lightsource Renewable UK Development Limited |
240 MW | Scoping |
| Lightsource New Eggborough Wind + storage · Lightsource Renewable UK Development Limited |
240 MW | Scoping |
| Lightsource Willington Wind + storage · Lightsource Renewable UK Development Limited |
240 MW | Scoping |
| Lightsourcebp Wakeleys Wind and BESS Wind + storage · Lightsource Renewable UK Development Limited |
240 MW | Scoping |
| Mid Hill Wind + storage · Invenergy Development UK Ltd |
228 MW | Scoping |
| Cnoc Buidhe Wind Farm Wind + storage · Cnoc Buidhe Wind Energy Hub Limited |
220 MW | Scoping |
| Rivox Wind Farm Wind + storage · Rivox Wind Energy Hub Limited |
220 MW | Scoping |
| Clash Gour Wind + storage · Clash Gour Windfarm Holdings Limited |
210 MW | Awaiting Consents |
| Cliffhope Wind + storage · Invenergy Development UK Ltd |
205 MW | Scoping |
| Clune Wind Farm Wind + storage · Renewable Energy Systems Limited |
187 MW | Scoping |
| Assel Valley Extension Wind Farm Wind + storage · Renantis UK Limited |
175 MW | Scoping |
| Creag Dhubh Windfarm Wind + storage · Invenergy Development UK Ltd |
171 MW | Scoping |
| Limekiln Extension 2 Wind + storage · Boralex Limited |
171 MW | Scoping |
| Craiglarie Wind Farm Wind + storage · Invenergy Development UK Ltd |
170 MW | Scoping |
| Highland Wind Farm Wind + storage · Highland Wind Farm Limited |
168 MW | Scoping |
| Limekiln Wind + storage · Limekiln Extension Limited |
167 MW | Scoping |
| Deucheran Hill 2 Wind Farm Wind + storage · RWE Renewables UK Onshore Wind Limited |
165 MW | Scoping |
| Glen Lednock Wind + storage · Glen Lednock Wind Farm Limited |
165 MW | Scoping |
| Harestanes Wind + storage · Scottish Power Renewables (UK) Limited |
163 MW | Under Construction/Commissioning |
| Garn Fach Wind Farm Wind + storage · Edf Energy Renewables Limited |
162 MW | Scoping |
| Balinoe Wind Farm Wind + storage · RWE Renewables UK Onshore Wind Limited |
161 MW | Scoping |
| Craigdarroch Hybrid Wind and BESS Wind + storage · Voltalia UK Ltd |
159 MW | Scoping |
| Longcroft Energy Park Wind + storage · Glenburnie Energy Limited |
156 MW | Scoping |
| Meall Dearg Wind + storage · Energyfarm UK Meall Dearg Ltd |
150 MW | Scoping |
| Afan Wind Farm and BESS Wind + storage · TRYDAN GWYRDD CYMRU (Welsh Government) Ltd |
150 MW | Scoping |
| Cnoc Buidhe Wind Farm Wind + storage · Cnoc Buidhe Wind Energy Hub Limited |
150 MW | Scoping |
| Torfichen Energy Park Wind + storage · Torfichen Energy Limited |
150 MW | Scoping |
| Woodland Ridge Wind + storage · Cubico UK Development Limited |
150 MW | Scoping |
| Achrugan Wind Farm Wind + storage · Statkraft Windco 1 Limited |
149 MW | Scoping |
| Ballach Wind + storage · Energyfarm UK Ballach Ltd |
149 MW | Scoping |
| Aberarder Extension Wind Farm Wind + storage · Renewable Energy Systems Limited |
138 MW | Scoping |
| Altnabreac Windfarm Wind + storage · Altnabreac Wind Farm Limited |
130 MW | Scoping |
| Bloch Energy Park Wind + storage · Renewable Energy Systems Limited |
126 MW | Scoping |
| Harestanes Wind + storage · Scottish Power Renewables (UK) Limited |
125 MW | |
| Newlands Hill Wind Energy Hub Wind + storage · Newlands Hill Wind Energy Hub Limited |
119 MW | Awaiting Consents |
| Blacklaw Wind + storage · Scottish Power Renewables (UK) Limited |
118 MW | |
| Culachy Wind Farm Wind + storage · Fred Olsen Renewables Limited |
115 MW | Scoping |
| Pencloe Windfarm Wind + storage · Pencloe Wind Energy Limited |
115 MW | Scoping |
| Slickly Wind Farm Wind + storage · Slickly Wind Farm Limited |
114 MW | Consents Approved |
| Coille Linne Wind + storage · Energyfarm UK Coille Linne Ltd |
113 MW | Scoping |
| Brechfa Dau Wind Farm Wind + storage · TRYDAN GWYRDD CYMRU (Welsh Government) Ltd |
111 MW | Scoping |
| Clauchrie Windfarm Wind + storage · Scottish Power Renewables (UK) Limited |
108 MW | Scoping |
| Limekiln Wind + storage · Limekiln Extension Limited |
106 MW |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.