Wind + storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown10613.6 GW in total
In planning97scoping or awaiting consent
Consented or building2closest to connecting
Built7connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

106 projects · page 1 of 3
ProjectCapacityStageConnection siteFrom
ER TWD Energy
Wind + storage · Er Project Development Co Limited
700 MWScoping Llanteg 400kV Substation
National Grid (England & Wales)
Sep 2037
Glenfiddich West
Wind + storage · Boralex Limited
600 MWScoping New North East Substation 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Blacklaw
Wind + storage · Scottish Power Renewables (UK) Limited
340 MWScoping Blacklaw 132/33kV
SP Transmission (south Scotland)
Oct 2032
Knarie
Wind + storage · Invenergy Development UK Ltd
297 MWAwaiting Consents Narie 400/132kV Substation
SP Transmission (south Scotland)
Oct 2036
Bodinglee Wind Farm
Wind + storage · Bodinglee Wind Farm Limited
280 MWAwaiting Consents Bodinglee Wind Farm 132kV
SP Transmission (south Scotland)
Apr 2029
Dunan Hill
Wind + storage · Perigus Energy UK Limited
250 MWScoping Dunan Hill 400kV substation
SSEN Transmission (north Scotland)
Oct 2035
Lightsource Bagots Farm
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Folly Farm
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2037
Lightsource New Eggborough
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Lightsource Willington
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsourcebp Wakeleys Wind and BESS
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node G 400kV
National Grid (England & Wales)
Oct 2037
Mid Hill
Wind + storage · Invenergy Development UK Ltd
228 MWScoping Mid Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2034
Cnoc Buidhe Wind Farm
Wind + storage · Cnoc Buidhe Wind Energy Hub Limited
220 MWScoping Cnoc Buidhe 132kV/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Rivox Wind Farm
Wind + storage · Rivox Wind Energy Hub Limited
220 MWScoping Rivox 132/33kV
SP Transmission (south Scotland)
Oct 2031
Clash Gour
Wind + storage · Clash Gour Windfarm Holdings Limited
210 MWAwaiting Consents Clash Gour Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Cliffhope
Wind + storage · Invenergy Development UK Ltd
205 MWScoping Teviot 400/132kV Substation
SP Transmission (south Scotland)
Oct 2034
Clune Wind Farm
Wind + storage · Renewable Energy Systems Limited
187 MWScoping Clune 132/33 kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Assel Valley Extension Wind Farm
Wind + storage · Renantis UK Limited
175 MWScoping Maybole GSP
SP Transmission (south Scotland)
Oct 2037
Creag Dhubh Windfarm
Wind + storage · Invenergy Development UK Ltd
171 MWScoping Creag Dhubh Wind Farm and BESS 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Limekiln Extension 2
Wind + storage · Boralex Limited
171 MWScoping New Limekiln 132 kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Craiglarie Wind Farm
Wind + storage · Invenergy Development UK Ltd
170 MWScoping Ladyburn 132kV Substation
SP Transmission (south Scotland)
Oct 2037
Highland Wind Farm
Wind + storage · Highland Wind Farm Limited
168 MWScoping Highland Wind Farm 132/33kV substation
SSEN Transmission (north Scotland)
Oct 2030
Limekiln
Wind + storage · Limekiln Extension Limited
167 MWScoping Limekilns 132/33kV substation
SSEN Transmission (north Scotland)
Dec 2030
Deucheran Hill 2 Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
165 MWScoping Deucheran Hill 2 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Glen Lednock
Wind + storage · Glen Lednock Wind Farm Limited
165 MWScoping Glen Lednock 132kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Harestanes
Wind + storage · Scottish Power Renewables (UK) Limited
163 MWUnder Construction/Commissioning Harestanes West Wind Farm 132/33kV
SP Transmission (south Scotland)
Mar 2028
Garn Fach Wind Farm
Wind + storage · Edf Energy Renewables Limited
162 MWScoping Mid Wales Connection Node A 400Kv Substation
National Grid (England & Wales)
Oct 2037
Balinoe Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
161 MWScoping Balinoe 132kV substation
SSEN Transmission (north Scotland)
Oct 2034
Craigdarroch Hybrid Wind and BESS
Wind + storage · Voltalia UK Ltd
159 MWScoping Craigdarroch Hybrid Wind & BESS 132kV Substation
SP Transmission (south Scotland)
Jun 2037
Longcroft Energy Park
Wind + storage · Glenburnie Energy Limited
156 MWScoping Longcroft Energy Park 132Kv Substation
SP Transmission (south Scotland)
May 2031
Meall Dearg
Wind + storage · Energyfarm UK Meall Dearg Ltd
150 MWScoping New North West 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Afan Wind Farm and BESS
Wind + storage · TRYDAN GWYRDD CYMRU (Welsh Government) Ltd
150 MWScoping South Wales West Connection Node A 132Kv Substation
National Grid (England & Wales)
Dec 2036
Cnoc Buidhe Wind Farm
Wind + storage · Cnoc Buidhe Wind Energy Hub Limited
150 MWScoping Cnoc Buidhe 132kV/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Torfichen Energy Park
Wind + storage · Torfichen Energy Limited
150 MWScoping Torfichen Energy Park 132kV Substation
SP Transmission (south Scotland)
Oct 2030
Woodland Ridge
Wind + storage · Cubico UK Development Limited
150 MWScoping Hawick 132kV Substation
SP Transmission (south Scotland)
Jul 2034
Achrugan Wind Farm
Wind + storage · Statkraft Windco 1 Limited
149 MWScoping Achrugan 132kV Substation
SSEN Transmission (north Scotland)
Jul 2030
Ballach
Wind + storage · Energyfarm UK Ballach Ltd
149 MWScoping New North West 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Aberarder Extension Wind Farm
Wind + storage · Renewable Energy Systems Limited
138 MWScoping Aberarder Extension Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2031
Altnabreac Windfarm
Wind + storage · Altnabreac Wind Farm Limited
130 MWScoping Connagill 275kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Bloch Energy Park
Wind + storage · Renewable Energy Systems Limited
126 MWScoping Bloch Energy Park 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Harestanes
Wind + storage · Scottish Power Renewables (UK) Limited
125 MWBuilt Harestanes West Wind Farm 132/33kV
SP Transmission (south Scotland)
Newlands Hill Wind Energy Hub
Wind + storage · Newlands Hill Wind Energy Hub Limited
119 MWAwaiting Consents Newlands Hill 132/33kV
SP Transmission (south Scotland)
Apr 2030
Blacklaw
Wind + storage · Scottish Power Renewables (UK) Limited
118 MWBuilt Blacklaw 132/33kV
SP Transmission (south Scotland)
Culachy Wind Farm
Wind + storage · Fred Olsen Renewables Limited
115 MWScoping Fort Augustus 2 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Pencloe Windfarm
Wind + storage · Pencloe Wind Energy Limited
115 MWScoping Pencloe 132/33kV Substation
SP Transmission (south Scotland)
Apr 2028
Slickly Wind Farm
Wind + storage · Slickly Wind Farm Limited
114 MWConsents Approved Slickly Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Dec 2029
Coille Linne
Wind + storage · Energyfarm UK Coille Linne Ltd
113 MWScoping Coille Linne 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Brechfa Dau Wind Farm
Wind + storage · TRYDAN GWYRDD CYMRU (Welsh Government) Ltd
111 MWScoping Llandyfaelog 132kV Substation
National Grid (England & Wales)
Dec 2036
Clauchrie Windfarm
Wind + storage · Scottish Power Renewables (UK) Limited
108 MWScoping Clauchrie 132/33KV Substation
SP Transmission (south Scotland)
May 2033
Limekiln
Wind + storage · Limekiln Extension Limited
106 MWBuilt Limekilns 132/33kV substation
SSEN Transmission (north Scotland)
Page 1 of 3

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.