Grid infrastructure β€Ί Connection queue β€Ί Wind + storage

WIND + STORAGE Β· NGET

ER TWD Energy

ER TWD Energy is a 700 MW wind + storage project in planning, connecting to the National Grid (England & Wales) network at Llanteg 400kV Substation, with capacity due from September 2037. The connection agreement is held by Er Project Development Co Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003719
Customer
Er Project Development Co Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
700 MW
Change in this agreement
+700 MW
Capacity effective from
15 September 2037
Connection site
Llanteg 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Llanteg Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem