Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · NGETBrechfa Dau Wind Farm
Brechfa Dau Wind Farm is a 111 MW wind + storage project in planning, connecting to the National Grid (England & Wales) network at Llandyfaelog 132kV Substation, with capacity due from December 2036. The connection agreement is held by TRYDAN GWYRDD CYMRU (Welsh Government) Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Dec 2036 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003847
- Customer
- TRYDAN GWYRDD CYMRU (Welsh Government) Ltd
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 111 MW
- Change in this agreement
- +111 MW
- Capacity effective from
- 6 December 2036
- Connection site
- Llandyfaelog 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Other projects at Llandyfaelog 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem