Grid infrastructure β€Ί Connection queue β€Ί Wind + storage

WIND + STORAGE Β· SPT

Harestanes

Harestanes is a 125 MW wind + storage project built and connected, connecting to the SP Transmission (south Scotland) network at Harestanes West Wind Farm 132/33kV. The connection agreement is held by Scottish Power Renewables (UK) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000064-1
Customer
Scottish Power Renewables (UK) Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
125 MW
Already connected
125 MW
Connection site
Harestanes West Wind Farm 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Harestanes West Wind Farm Β· Grid map

Other projects at Harestanes West Wind Farm 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem