Grid infrastructure › Connection queue › Wind + storage

WIND + STORAGE · SPT

Harestanes

Harestanes is a 163 MW wind + storage project under construction or commissioning, connecting to the SP Transmission (south Scotland) network at Harestanes West Wind Farm 132/33kV, with capacity due from March 2028. The connection agreement is held by Scottish Power Renewables (UK) Limited.

Project stageUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingFrom Mar 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000064-2
Customer
Scottish Power Renewables (UK) Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
163 MW
Change in this agreement
+38 MW
Capacity effective from
31 March 2028
Connection site
Harestanes West Wind Farm 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Under Construction/Commissioning

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Harestanes West Wind Farm · Grid map

Other projects at Harestanes West Wind Farm 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem