WIND + STORAGE · SPTHarestanes
Harestanes is a 163 MW wind + storage project under construction or commissioning, connecting to the SP Transmission (south Scotland) network at Harestanes West Wind Farm 132/33kV, with capacity due from March 2028. The connection agreement is held by Scottish Power Renewables (UK) Limited.
Project stageUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingFrom Mar 2028 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000064-2
- Customer
- Scottish Power Renewables (UK) Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 163 MW
- Change in this agreement
- +38 MW
- Capacity effective from
- 31 March 2028
- Connection site
- Harestanes West Wind Farm 132/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Under Construction/Commissioning
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Projects connecting near Harestanes West Wind Farm · Grid map
Other projects at Harestanes West Wind Farm 132/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem