Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTHarestanes West Wind Farm
Harestanes West Wind Farm is a 56 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Harestanes West Wind Farm 132/33kV, with capacity due from September 2029. The connection agreement is held by Scottish Power Renewables (UK) Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Sep 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001075-1
- Customer
- Scottish Power Renewables (UK) Limited
- Technology
- Wind Onshore
- Total capacity
- 56 MW
- Change in this agreement
- +56 MW
- Capacity effective from
- 1 September 2029
- Connection site
- Harestanes West Wind Farm 132/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Projects connecting near Harestanes West Wind Farm · Grid map
Other projects at Harestanes West Wind Farm 132/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem