Grid infrastructure βΊ Connection queue βΊ Wind + storage
WIND + STORAGE Β· SPTBodinglee Wind Farm
Bodinglee Wind Farm is a 280 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Bodinglee Wind Farm 132kV, with capacity due from April 2029. The connection agreement is held by Bodinglee Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001985
- Customer
- Bodinglee Wind Farm Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 280 MW
- Change in this agreement
- +280 MW
- Capacity effective from
- 30 April 2029
- Connection site
- Bodinglee Wind Farm 132kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem