Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · SPTCraiglarie Wind Farm
Craiglarie Wind Farm is a 170 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Ladyburn 132kV Substation, with capacity due from October 2037. The connection agreement is held by Invenergy Development UK Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005971
- Customer
- Invenergy Development UK Ltd
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 170 MW
- Change in this agreement
- +170 MW
- Capacity effective from
- 31 October 2037
- Connection site
- Ladyburn 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Other projects at Ladyburn 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem