Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · SPTCraigdarroch Hybrid Wind and BESS
Craigdarroch Hybrid Wind and BESS is a 159 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Craigdarroch Hybrid Wind & BESS 132kV Substation, with capacity due from June 2037. The connection agreement is held by Voltalia UK Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005012
- Customer
- Voltalia UK Ltd
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 159 MW
- Change in this agreement
- +159 MW
- Capacity effective from
- 30 June 2037
- Connection site
- Craigdarroch Hybrid Wind & BESS 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Projects connecting near Craigdarroch Hybrid Wind & BESS · Grid map
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem