Grid infrastructure › Connection queue › Wind + storage

WIND + STORAGE · SPT

Craigdarroch Hybrid Wind and BESS

Craigdarroch Hybrid Wind and BESS is a 159 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Craigdarroch Hybrid Wind & BESS 132kV Substation, with capacity due from June 2037. The connection agreement is held by Voltalia UK Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005012
Customer
Voltalia UK Ltd
Technology
Energy Storage System, Wind Onshore
Total capacity
159 MW
Change in this agreement
+159 MW
Capacity effective from
30 June 2037
Connection site
Craigdarroch Hybrid Wind & BESS 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Craigdarroch Hybrid Wind & BESS · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem