Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · SPTTorfichen Energy Park
Torfichen Energy Park is a 150 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Torfichen Energy Park 132kV Substation, with capacity due from October 2030. The connection agreement is held by Torfichen Energy Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2030 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002598
- Customer
- Torfichen Energy Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 150 MW
- Change in this agreement
- +150 MW
- Capacity effective from
- 31 October 2030
- Connection site
- Torfichen Energy Park 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem