Grid infrastructure βΊ Connection queue βΊ Wind + storage
WIND + STORAGE Β· SPTMid Hill
Mid Hill is a 228 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Mid Hill 132kV Substation, with capacity due from October 2034. The connection agreement is held by Invenergy Development UK Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005000
- Customer
- Invenergy Development UK Ltd
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 228 MW
- Change in this agreement
- +228 MW
- Capacity effective from
- 30 October 2034
- Connection site
- Mid Hill 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem