Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · SHETClash Gour
Clash Gour is a 210 MW wind + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Clash Gour Wind Farm 132kV Substation, with capacity due from October 2029. The connection agreement is held by Clash Gour Windfarm Holdings Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001022
- Customer
- Clash Gour Windfarm Holdings Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 210 MW
- Change in this agreement
- +210 MW
- Capacity effective from
- 30 October 2029
- Connection site
- Clash Gour Wind Farm 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem