Grid infrastructure › Connection queue › Wind + storage

WIND + STORAGE · SHET

Clash Gour

Clash Gour is a 210 MW wind + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Clash Gour Wind Farm 132kV Substation, with capacity due from October 2029. The connection agreement is held by Clash Gour Windfarm Holdings Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001022
Customer
Clash Gour Windfarm Holdings Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
210 MW
Change in this agreement
+210 MW
Capacity effective from
30 October 2029
Connection site
Clash Gour Wind Farm 132kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents

Connection site

The connection site could not be placed on the map.

Projects connecting near Clash Gour Wind Farm · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem