Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · SPTBloch Energy Park
Bloch Energy Park is a 126 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Bloch Energy Park 132kV Substation, with capacity due from October 2031. The connection agreement is held by Renewable Energy Systems Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002447
- Customer
- Renewable Energy Systems Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 126 MW
- Change in this agreement
- +126 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Bloch Energy Park 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem