Grid infrastructure › Connection queue › Wind + storage

WIND + STORAGE · SPT

Bloch Energy Park

Bloch Energy Park is a 126 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Bloch Energy Park 132kV Substation, with capacity due from October 2031. The connection agreement is held by Renewable Energy Systems Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002447
Customer
Renewable Energy Systems Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
126 MW
Change in this agreement
+126 MW
Capacity effective from
31 October 2031
Connection site
Bloch Energy Park 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Bloch Energy Park · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem