Grid infrastructure β€Ί Connection queue β€Ί Wind + storage

WIND + STORAGE Β· SPT

Cliffhope

Cliffhope is a 205 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Teviot 400/132kV Substation, with capacity due from October 2034. The connection agreement is held by Invenergy Development UK Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-006052
Customer
Invenergy Development UK Ltd
Technology
Energy Storage System, Wind Onshore
Total capacity
205 MW
Change in this agreement
+205 MW
Capacity effective from
31 October 2034
Connection site
Teviot 400/132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Teviot Β· Grid map

Other projects at Teviot 400/132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem