Grid infrastructure › Connection queue › Wind + storage

WIND + STORAGE · SHET

Cnoc Buidhe Wind Farm

Cnoc Buidhe Wind Farm is a 220 MW wind + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Cnoc Buidhe 132kV/33kV Substation, with capacity due from October 2034. The connection agreement is held by Cnoc Buidhe Wind Energy Hub Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001672-2
Customer
Cnoc Buidhe Wind Energy Hub Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
220 MW
Change in this agreement
+70 MW
Capacity effective from
31 October 2034
Connection site
Cnoc Buidhe 132kV/33kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Cnoc Buidhe · Grid map

Other projects at Cnoc Buidhe 132kV/33kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem