Projects shown1117.0 GW in total
In planning3scoping or awaiting consent
Consented or building2closest to connecting
Built6connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

11 projects
ProjectCapacityStageConnection siteFrom
Hinkley Point C
Nuclear Β· Nnb Generation Company (Hpc) Limited
3.3 GWScoping Shurton 400kV Substation
National Grid (England & Wales)
Jul 2030
Sizewell C
Nuclear Β· Sizewell C Limited
3.3 GWConsents Approved Sizewell 400kV Substation
National Grid (England & Wales)
Jul 2036
Heysham Power Station
Nuclear Β· EDF Energy Nuclear Generation Limited
2.4 GWBuilt Heysham GSP
National Grid (England & Wales)
Hinkley Point C
Nuclear Β· Nnb Generation Company (Hpc) Limited
1.7 GWScoping Shurton 400kV Substation
National Grid (England & Wales)
Mar 2029
Sizewell C
Nuclear Β· Sizewell C Limited
1.7 GWConsents Approved Sizewell 400kV Substation
National Grid (England & Wales)
Jul 2035
Torness
Nuclear Β· EDF Energy Nuclear Generation Limited
1.3 GWBuilt Torness 400/132kV
SP Transmission (south Scotland)
Sizewell B
Nuclear Β· EDF Energy Nuclear Generation Limited
1.2 GWBuilt Sizewell 400kV Substation
National Grid (England & Wales)
Hartlepool
Nuclear Β· EDF Energy Nuclear Generation Limited
1.2 GWBuilt Hartlepool 275kV Substation
National Grid (England & Wales)
Trawsfynydd B Cwmni Egino
Nuclear Β· Cwmni Egino
940 MWScoping Trawsfynydd 275kV Substation
National Grid (England & Wales)
Nov 2037
Hunterston
Nuclear Β· Nuclear Restoration Services Limited
0 MWBuilt Hunterston 400/132kV
SP Transmission (south Scotland)
Dungeness B
Nuclear Β· EDF Energy Nuclear Generation Limited
0 MWBuilt Dungeness 275kV Substation
National Grid (England & Wales)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.