Grid infrastructure βΊ Connection queue βΊ Gas
GAS Β· NGETBute Hydrogen Project 5
Bute Hydrogen Project 5 is a 3.6 GW gas project in planning, connecting to the National Grid (England & Wales) network at Teeside Connection Node B, with capacity due from October 2035. The connection agreement is held by Haldane Energy Project 5 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2035 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004128
- Customer
- Haldane Energy Project 5 Limited
- Technology
- CCGT (Combined Cycle Gas Turbine)
- Total capacity
- 3.6 GW
- Change in this agreement
- +3.6 GW
- Capacity effective from
- 31 October 2035
- Connection site
- Teeside Connection Node B
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
This project connects at a new substation (a βconnection nodeβ) that has not been built or located yet.
Projects connecting near Teeside Connection Node B Β· Grid map
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem