Grid infrastructure β€Ί Connection queue β€Ί Interconnector

INTERCONNECTOR Β· NGET

IFA Interconnector

IFA Interconnector is a 2.0 GW interconnector project built and connected, connecting to the National Grid (England & Wales) network at Sellindge 400kV Substation. The connection agreement is held by National Grid Interconnectors Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000282
Customer
National Grid Interconnectors Limited
Technology
Interconnector
Export capacity
2.0 GW
Import capacity
2.0 GW
Already connected
2.0 GW
Connection site
Sellindge 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Interconnector
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Sellindge Β· Grid map

Other projects at Sellindge 400kV Substation

Source: NESO interconnector register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem