Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Damhead Creek 2

Damhead Creek 2 is a 1.8 GW battery storage project consented, connecting to the National Grid (England & Wales) network at Kingsnorth 400kV Substation, with capacity due from October 2030. The connection agreement is held by VPI Power Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2030 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001056
Customer
VPI Power Limited
Technology
CCGT (Combined Cycle Gas Turbine), Energy Storage System, OCGT (Open Cycle Gas Turbine)
Total capacity
1.8 GW
Change in this agreement
+1.8 GW
Capacity effective from
31 October 2030
Connection site
Kingsnorth 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Kingsnorth Β· Grid map

Other projects at Kingsnorth 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem