West Burton B is a 1.8 GW battery storage project built and connected, connecting to the National Grid (England & Wales) network at West Burton 400kV Substation. The connection agreement is held by West Burton B Limited.
Connection details
- NESO project number
- PRO-000369-1
- Customer
- West Burton B Limited
- Technology
- CCGT (Combined Cycle Gas Turbine), Energy Storage System
- Total capacity
- 1.8 GW
- Already connected
- 1.3 GW
- Change in this agreement
- +500 MW
- Capacity effective from
- 30 October 2027
- Connection site
- West Burton 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.