Grid infrastructure › Connection queue › Offshore wind

OFFSHORE WIND · SHET

Bellrock Offshore Wind Farm

Bellrock Offshore Wind Farm is a 1.8 GW offshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Hurlie 400kV substation, with capacity due from October 2035. The connection agreement is held by Bellrock Offshore Wind Farm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001496-2
Customer
Bellrock Offshore Wind Farm Limited
Technology
Wind Offshore
Total capacity
1.8 GW
Change in this agreement
+600 MW
Capacity effective from
31 October 2035
Connection site
Hurlie 400kV substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Hurlie · Grid map

Other projects at Hurlie 400kV substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem