Grid infrastructure β€Ί Connection queue β€Ί Interconnector

INTERCONNECTOR Β· SPT

LIRIC Interconnector

LIRIC Interconnector is a 700 MW interconnector project in planning, connecting to the SP Transmission (south Scotland) network at Hunterston East 400kV, with capacity due from October 2032. The connection agreement is held by TI LIRIC Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2032 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001454
Customer
TI LIRIC Limited
Technology
Interconnector
Export capacity
700 MW
Import capacity
730 MW
Change in this agreement
+700 MW
Capacity effective from
31 October 2032
Connection site
Hunterston East 400kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Interconnector
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Hunterston East Β· Grid map

Other projects at Hunterston East 400kV

Source: NESO interconnector register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem