Grid infrastructure β€Ί Connection queue β€Ί Interconnector

INTERCONNECTOR Β· NGET

Seneca

Seneca is a 1.3 GW interconnector project in planning, connecting to the National Grid (England & Wales) network at Mablethorpe 400kV Substation, with capacity due from November 2031. The connection agreement is held by Frontier Power International Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-000981
Customer
Frontier Power International Limited
Technology
Interconnector
Export capacity
1.3 GW
Import capacity
1.2 GW
Change in this agreement
+1.3 GW
Capacity effective from
30 November 2031
Connection site
Mablethorpe 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Interconnector
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Mablethorpe Β· Grid map

Other projects at Mablethorpe 400kV Substation

Source: NESO interconnector register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem