Grid infrastructure βΊ Connection queue βΊ Interconnector
INTERCONNECTOR Β· SPTAuchencrosh (interconnector CCT)
Auchencrosh (interconnector CCT) is a 500 MW interconnector project built and connected, connecting to the SP Transmission (south Scotland) network at Auchencrosh 275kV. The connection agreement is held by Moyle Interconnector Limited.
Connection details
- NESO project number
- PRO-001292
- Customer
- Moyle Interconnector Limited
- Technology
- Interconnector
- Export capacity
- 500 MW
- Import capacity
- 500 MW
- Already connected
- 500 MW
- Connection site
- Auchencrosh 275kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Interconnector
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.