INTERCONNECTOR Β· SHET

NorthConnect

NorthConnect is a 1.4 GW interconnector project in planning, connecting to the SSEN Transmission (north Scotland) network at Peterhead 400kV Substation, with capacity due from March 2030. The connection agreement is held by Northconnect Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Mar 2030 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001285
Customer
Northconnect Limited
Technology
Interconnector
Export capacity
1.4 GW
Import capacity
1.4 GW
Change in this agreement
+1.4 GW
Capacity effective from
1 March 2030
Connection site
Peterhead 400kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Interconnector
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Peterhead Β· Grid map

Other projects at Peterhead 400kV Substation

Source: NESO interconnector register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem