United States › Grid › Interconnection queues › Virginia

GAS · PJM

Elizabeth River GT2

Elizabeth River GT2 is a 20.0 MW gas request built and operating in the PJM interconnection queue, in City Of Chesapeake County, Virginia, connecting to Dominion.

Queue statusOperating
  1. PlanningQueued Jul 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2008 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
S91
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Elizabeth River 230kV
Location
City Of Chesapeake County, Virginia
Technology
Gas: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 July 2007
Proposed online date
June 2008
Came online
June 2008

Location

Marker shows the centre of City Of Chesapeake County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in City Of Chesapeake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem