United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in NYISO (New York)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Vineyard Mid-Atlantic West Offshore wind · Vineyard Mid-Atlantic LLC |
1,321 MW | In study |
| Bluepoint Wind 1 Offshore wind · Bluepoint Wind LLC |
1,310 MW | In study |
| Sunrise Wind Offshore wind · Sunrise Wind LLC |
880 MW | In study |
| Empire Wind 1 Offshore wind · Empire Offshore Wind LLC |
816 MW | In study |
| Cider Solar Solar · Hecate Energy Cider Solar LLC |
500 MW | In study |
| Bull Run II Wind Onshore wind · Bull Run Energy LLC |
449 MW | In study |
| Mineral Basin Solar Power Solar · Mineral Basin Solar Power, LLC |
402 MW | In study |
| Shallow Seam BESS Battery storage · Shallow Seam Energy Storage, LLC |
400 MW | In study |
| North Country Wind Onshore wind · NY North Country, LLC |
380 MW | In study |
| North Country Wind II Onshore wind · NY North Country, LLC |
380 MW | In study |
| Resilient NY Energy Storage Battery storage · Resilient NY Storage, LLC by Hanwha Energy USA Holdings Corporation, its Manager |
349 MW | In study |
| Alle Catt II Wind Onshore wind · Alle-Catt Wind Energy LLC |
339 MW | In study |
| Stargazer II Solar + storage · RWE Solar Development, LLC |
325 MW | In study |
| Stargazer I Solar + storage · RWE Solar Development, LLC |
325 MW | In study |
| Blue Spruce Storage Battery storage · Blue Spruce Storage LLC |
300 MW | In study |
| Sugar Loaf Energy Storage I Battery storage · Hambletonian Energy Storage LLC |
300 MW | In study |
| Willard Storage Battery storage · Emeren US, LLC |
300 MW | In study |
| Swiss Valley Energy Storage Battery storage · Sawhall Energy Storage LLC |
300 MW | In study |
| Canisteo Wind Onshore wind · Canisteo Wind Energy LLC |
291 MW | In study |
| Excelsior Energy Center Solar · Excelsior Energy Center, LLC |
280 MW | In study |
| South Ripley Solar and BESS Solar + storage · ConnectGen Chautauqua County LLC |
270 MW | In study |
| Moonlight Flats Solar Solar · Moonlight Flats Solar Power, LLC |
250 MW | In study |
| Lighthouse Energy Storage Battery storage · GCI Lighthouse Energy Storage, LLC |
250 MW | In study |
| NY125A - Fort Covington Solar Solar · Fort Covington Solar LLC |
250 MW | In study |
| Mill Point Solar Solar + storage · ConnectGen Montgomery County LLC |
250 MW | In study |
| Kce NY 38 Battery storage · KCE NY 38, LLC |
250 MW | In study |
| East Setauket Storage II Battery storage · East Setauket Energy Storage, LLC |
248 MW | In study |
| Town Line Solar CSR Phase I Solar + storage · RWE Solar Development, LLC |
240 MW | In study |
| Rich Road Solar Energy Center Solar + storage · Rich Road Solar Energy Center, LLC |
240 MW | In study |
| Erie Canal BESS Battery storage · RWE Solar Development, LLC |
230 MW | In study |
| NYC Energy LLC - Phase 2 Battery storage · NYC Energy |
220 MW | In study |
| East Fishkill Battery storage · East Fishkill Storage 1, LLC |
205 MW | In study |
| Gemma Energy Storage Battery storage · Hanwha Q CELLS USA Corp. |
200 MW | In study |
| Garnet Energy Center Solar · Garnet Energy Center, LLC |
200 MW | In study |
| BPP NY Lansing BESS I Battery storage · BPP NY Lansing BESS I LLC |
200 MW | In study |
| Southern Tier Energy Center Battery storage · Southern Tier Energy Center, LLC |
200 MW | In study |
| Kce NY 2 Battery storage · KCE NY 2, LLC |
200 MW | In study |
| NY125C - Little Salmon Solar Solar · Little Salmon Solar LLC |
200 MW | In study |
| NY125B - Two Rivers Solar Solar · Two Rivers Solar Farm, LLC |
200 MW | In study |
| Hemlock Ridge Solar Solar · Hemlock Ridge Solar LLC |
200 MW | In study |
| Highbush Energy Storage Battery storage · Hanwha Q CELLS USA Corp. |
200 MW | In study |
| Wheelhouse Energy Storage Battery storage · NEER Interconnection Holdings, LLC |
200 MW | In study |
| Flat Creek Solar Solar · Flat Creek Solar NY LLC |
200 MW | In study |
| Overlook Storage Battery storage · Origis Development LLC |
199 MW | In study |
| Battery Park Storage Battery storage · Battery Park Storage LLC |
190 MW | In study |
| Horseshoe Solar Solar · Horseshoe Solar Energy LLC |
180 MW | In study |
| Elevate Arthur Kill II Battery storage · Lighthouse Arthur Kill II, LLC |
180 MW | In study |
| Gateway Solar Energy Center Solar · Gateway Solar Energy Center, LLC |
180 MW | In study |
| Lockport Storage Battery storage · Origis Development LLC |
180 MW | In study |
| Kimberlite Solar Solar · Kimberlite Solar Power, LLC |
175 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)