BATTERY STORAGE · NYISOLockport Storage
Lockport Storage is a 180 MW battery storage request in interconnection study in the NYISO interconnection queue, in Niagara County, New York, connecting to NYSEG.
Queue statusIn planning
- PlanningQueued Oct 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-326
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Origis Development LLC
- Connection point (POI)
- Robinson Road 230 kV
- Location
- Niagara County, New York
- Technology
- Battery: 180 MW
- Total requested
- 180 MW
- Queue status
- Active
- Entered queue
- 8 October 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Niagara County; the queue data does not give exact sites.
Other requests in Niagara County
- Erie Canal BESSBattery storage · 230 MW · in study
- Somerset SolarSolar · 125 MW · in study
- Buffalo Road Energy StorageBattery storage · 100 MW · in study
- Bear Ridge SolarSolar · 100 MW · in study
- Riverbank Power ABattery storage · 1,000 MW · withdrawn
- HuntleyGas · 752 MW · withdrawn
- SomersetCoal · 706 MW · withdrawn
- Ridge View Solar Energy CenterSolar · 350 MW · withdrawn
- Erie Canal BESSBattery storage · 230 MW · withdrawn
- Erie Canal BESSBattery storage · 230 MW · withdrawn
- Lighthouse WindOnshore wind · 201 MW · withdrawn
- BPP NY Somerset BESS IBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem