United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOWillard Storage
Willard Storage is a 300 MW battery storage request in interconnection study in the NYISO interconnection queue, in Rensselaer County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued Sep 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-148
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Emeren US, LLC
- Connection point (POI)
- Eastover 115kV
- Location
- Rensselaer County, New York
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Queue status
- Active
- Entered queue
- 10 September 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Rensselaer County; the queue data does not give exact sites.
Other requests in Rensselaer County
- Willard Storage (NYISO-C24-148)Battery storage · 300 MW · in study
- SolarSolar · 20.0 MW · in study
- Hilltop SolarSolar · 20.0 MW · in study
- CS Hawthorn SolarSolar · 20.0 MW · in study
- Empire GeneratingGas · 635 MW · built
- Empire GeneratingGas · 635 MW · built
- StephentownBattery storage · 20.0 MW · built
- StephentownBattery storage · 20.0 MW · built
- Knickerbocker Energy StorageBattery storage · 300 MW · withdrawn
- Topaz Storage ProjectBattery storage · 200 MW · withdrawn
- Honey Bee Battery Storage, LLCBattery storage · 199 MW · withdrawn
- Empire WindOnshore wind · 120 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem