United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOStephentown
Stephentown is a 20.0 MW battery storage request built and operating in the NYISO interconnection queue, in Rensselaer County, New York, connecting to NYSEG.
Request details
- Queue ID
- 260
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Stephentown Regulation Services, LLC
- Connection point (POI)
- Stephentown 115kV
- Location
- Rensselaer County, New York
- Technology
- Other Storage: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- SIS,CY10
- Queue status
- Operational
- Entered queue
- 25 September 2007
- Came online
- November 2011
Location
Marker shows the centre of Rensselaer County; the queue data does not give exact sites.
Other requests in Rensselaer County
- Willard Storage (NYISO-C24-148)Battery storage · 300 MW · in study
- Willard StorageBattery storage · 300 MW · in study
- SolarSolar · 20.0 MW · in study
- Hilltop SolarSolar · 20.0 MW · in study
- CS Hawthorn SolarSolar · 20.0 MW · in study
- Empire GeneratingGas · 635 MW · built
- Empire GeneratingGas · 635 MW · built
- StephentownBattery storage · 20.0 MW · built
- Knickerbocker Energy StorageBattery storage · 300 MW · withdrawn
- Topaz Storage ProjectBattery storage · 200 MW · withdrawn
- Honey Bee Battery Storage, LLCBattery storage · 199 MW · withdrawn
- Empire WindOnshore wind · 120 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem