United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Kickstart Energy Storage V

Kickstart Energy Storage V is a 999 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Ellis County, Texas.

Queue statusIn planning
  1. PlanningQueued Nov 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
29INR0217
Grid region
ERCOT (Texas)
Developer
Kickstart Infrastructure LLC
Connection point (POI)
345 KV Venus 1906 to Fort Smith 3389
Location
Ellis County, Texas
Technology
Battery: 999 MW
Total requested
999 MW
Study phase
SS Started, FIS Started, No IA
Queue status
Active
Entered queue
24 November 2025
Proposed online date
December 2029

Location

Marker shows the centre of Ellis County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Ellis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem