United States › Grid › Interconnection queues › Texas

SOLAR · ERCOT

Galaxy Solar 2

Galaxy Solar 2 is a 302 MW solar request in interconnection study in the ERCOT interconnection queue, in Ellis County, Texas.

Queue statusIn planning
  1. PlanningQueued Jun 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
28INR0385
Grid region
ERCOT (Texas)
Developer
Galaxy Solar 2, LLC
Connection point (POI)
3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127
Location
Ellis County, Texas
Technology
Solar: 302 MW
Total requested
302 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
19 June 2025
Proposed online date
October 2029

Location

Marker shows the centre of Ellis County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Ellis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem