United States βΊ Grid βΊ Transmission lines βΊ Texas
OCTARY USA Β· TRANSMISSIONTransmission lines in Texas
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Hartburg | 500 kV | 207 km |
| Leach β Hartburg | 500 kV | 105 km |
| Hartburg β Cypress | 500 kV | 51.4 km |
| Hartburg | 500 kV | 29.4 km |
| Hartburg | 500 kV | 1.0 km |
| Hartburg | 500 kV | 1.0 km |
| Substation names not reported | 500 kV | 0.2 km |
| Substation names not reported | 345 kV | 344 km |
| Substation names not reported | 345 kV | 264 km |
| Substation names not reported | 345 kV | 264 km |
| Substation names not reported | 345 kV | 260 km |
| Eddy Ac-dc-ac Tie | 345 kV | 254 km |
| Sotex5 | 345 kV | 226 km |
| Sotex5 | 345 kV | 223 km |
| Sotex5 | 345 kV | 223 km |
| Tonkawa | 345 kV | 214 km |
| Substation names not reported | 345 kV | 198 km |
| Brown β Killeen | 345 kV | 197 km |
| Brown β Killeen | 345 kV | 197 km |
| Hitchland | 345 kV | 190 km |
| Abilene Mulberry Creek | 345 kV | 186 km |
| Substation names not reported | 345 kV | 179 km |
| Substation names not reported | 345 kV | 176 km |
| Tesla | 345 kV | 176 km |
| Lobo β San Miguel | 345 kV | 170 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Oncor Electric Delivery Co.28,768 km Β· 8,064 km at 345 kV+
- AEP Texas Central Company6,242 km Β· 1,992 km at 345 kV+
- Centerpoint Energy Houston Electric, LLC4,114 km Β· 637 km at 345 kV+
- Southwestern Public Service Co.2,545 km Β· 358 km at 345 kV+
- Bandera Electric Coop, Inc2,313 km Β· 329 km at 345 kV+
- Bluebonnet Electric Coop, Inc2,190 km Β· 747 km at 345 kV+
- Oncor Electric Delivery Company LLC1,942 km Β· 1,680 km at 345 kV+
- Entergy Texas, Inc.1,842 km Β· 9.9 km at 345 kV+
- AEP Texas North Co.1,802 km Β· 85.8 km at 345 kV+
- Centerpoint Energy1,722 km Β· 694 km at 345 kV+
- Southwestern Public Service Co1,650 km Β· 699 km at 345 kV+
- Big Country Electric Coop, Inc1,513 km Β· 836 km at 345 kV+
- AEP Texas Central Co.1,464 km Β· 50.8 km at 345 kV+
- Pedernales Electric Coop, Inc1,020 km Β· 381 km at 345 kV+
- Southwestern Electric Power Co1,016 km Β· 280 km at 345 kV+
- AEP Texas North Company968 km Β· 625 km at 345 kV+
- Entergy Texas Inc.924 km Β· 690 km at 345 kV+
- Lighthouse Electric Coop, Inc908 km Β· 383 km at 345 kV+
- Taylor Electric Coop Inc - (tx)819 km Β· 246 km at 345 kV+
- Upshur Rural Elec Coop Corp743 km Β· 331 km at 345 kV+
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants