United States βΊ Grid βΊ Transmission lines βΊ Tennessee
OCTARY USA Β· TRANSMISSIONTransmission lines in Tennessee
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Wilson | 500 kV | 198 km |
| Volunteer β Watts Bar Power Station | 500 kV | 151 km |
| Maury β Browns Ferry | 500 kV | 140 km |
| Marshall β Cumberland 500kv | 500 kV | 125 km |
| Phillips Bend β Volunteer | 500 kV | 105 km |
| Maury β Franklin | 500 kV | 103 km |
| Sequoyah β Franklin | 500 kV | 101 km |
| Montgomery β Wilson | 500 kV | 92.5 km |
| Davidson β Johnsonville | 500 kV | 91.6 km |
| Weakley β Lagoon Creek | 500 kV | 87.7 km |
| Bull Run β Watts Bar Power Station | 500 kV | 86.9 km |
| Montgomery β Paradise | 500 kV | 84.3 km |
| Johnsonville | 500 kV | 83.9 km |
| Sullivan β Broadford (765 Kv) | 500 kV | 80.1 km |
| Sequoyah β Widows Creek 500kv | 500 kV | 79.6 km |
| Sullivan β Phillips Bend | 500 kV | 78.2 km |
| Davidson β Cumberland 500kv | 500 kV | 77.3 km |
| Johnsonville β Gleason | 500 kV | 69.7 km |
| Cordova β Benton | 500 kV | 68.0 km |
| Montgomery β Davidson | 500 kV | 66.1 km |
| Watts Bar Power Station | 500 kV | 63.7 km |
| Sullivan β Nagel | 500 kV | 63.4 km |
| Montgomery β Cumberland 500kv | 500 kV | 62.1 km |
| Shelby β Lagoon Creek | 500 kV | 56.9 km |
| Sequoyah β Watts Bar Power Station | 500 kV | 55.7 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Tennessee Valley Authority16,978 km Β· 2,633 km at 345 kV+
- Kingsport Power Co1,748 km Β· 45.2 km at 345 kV+
- Georgia Power Co143 km Β· 41.2 km at 345 kV+
- Duke Energy Carolinas, LLC132 km
- French Broad Elec Member Corp131 km
- East Kentucky Power Coop, Inc127 km
- Duke Energy Progress - (nc)118 km
- Brookfield Smoky Mountain Hydropower LLC84.8 km
- Entergy Mississippi Inc56.1 km Β· 0.9 km at 345 kV+
- Kentucky Utilities Co50.4 km
- Entergy Arkansas Inc45.2 km Β· 45.2 km at 345 kV+
- Union Electric Co - (mo)25.7 km
- Appalachian Power Co20.9 km
- AEP10.8 km
- Unknown0.1 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants